Download Print this page

Forest garden PALERMO ARBOUR Assembly Manual

Advertisement

Quick Links

IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY.
Thank you for choosing this Arbour manufactured by the UK's largest manufacturer of timber garden products. In order to gain the most benefit from it, please note the
following:
- Exercise particular care and follow instructions.
- This Arbour is pressure treated to ensure the longevity of all timber components and protect against rot. This may leave a colour difference on some parts that will
even out as the moisture content stabilises.
- Please ensure that you thoroughly check all component parts for quantity and quality before you commence building the product. If there are any missing parts,
please contact the help line as shown immediately. The manufacturer cannot be held liable for damaged items once any part of the product has been fitted or altered in
any way (e.g. Painted)
- Timber is a natural material. It will shrink and swell as a result of varying moisture content.
- Please keep all plastic bags and small parts away from children in order to reduce the risk of suffocation.
- Important Note : Do not lean or stand on rafters during assembly they are not load bearing.
- If there are any technical queries with the product, please contact our customer help line on 0844 248 9853 between the hours of 8.30 am and 5.00 pm Monday to
Friday.
TRASSP (SIDE PANEL)
TRASBB (BENCH BACK)
2
Metal plate
Forest Garden Ltd, Units 291 & 296 Hartlebury Trading estate, Hartlebury, Worcestershire, Dy10 4JB
2
1
TRASSB (BENCH)
16
4mm
4mm
60mm
5mm
MUST PRE DRILL
Important :
Assembly of
this Arbour
requires two
people.
2
T R A S R F ( R O O F )
1
88180850PTR (BARGE
BOARD)
TRASCAP (ROOF CAPPING)
28
4mm
40mm
4
100mm
PALERMO ARBOUR
ISSUE 0509
TRASTREL (TRELLIS BACK
PANEL)
4
TRASFIN (FINIAL)
1
REQUIRED TOOLS : (NOT SUPPLIED)
DRILL
POZI DRIVE SCREWDRIVER
SPIRIT LEVEL
TAPE MEASURE
HAMMER
JE
1
2

Advertisement

loading
Need help?

Need help?

Do you have a question about the PALERMO ARBOUR and is the answer not in the manual?

Questions and answers

Summary of Contents for Forest garden PALERMO ARBOUR

  • Page 1 TRASBB (BENCH BACK) TRASSB (BENCH) TRASCAP (ROOF CAPPING) REQUIRED TOOLS : (NOT SUPPLIED) DRILL 60mm 40mm POZI DRIVE SCREWDRIVER SPIRIT LEVEL Metal plate TAPE MEASURE HAMMER 100mm Forest Garden Ltd, Units 291 & 296 Hartlebury Trading estate, Hartlebury, Worcestershire, Dy10 4JB...
  • Page 2 ISSUE 0509 MUST PRE DRILL Offset Lay one of the side panels on the ground as shown. Place the bench against this so that the bench is offset from the post equally at the front and back and approximately 370mm from the end.
  • Page 3 ISSUE 0509 Place the roof assemblies on to the sides so that the notch slots onto the MUST PRE DRILL framework. Secure the roof in to position screwing down through the roof into the posts using 2 x 100mm screws for each roof section.