Download Print this page

Innovation First 111-5383 Installation Instructions

2 post desktop rack

Advertisement

Quick Links

Patent(s) Pending
2 Post Desktop Rack
Kit P/N:
111-5383

Advertisement

loading

Summary of Contents for Innovation First 111-5383

  • Page 1 Patent(s) Pending 2 Post Desktop Rack Installation Instructions Kit P/N: 111-5383...
  • Page 2: Kit Contents

    Kit Contents Kit Contents: Mounting Hardware: (2) Vertical Posts (Left & Right) (4) .250 x .500 Pan Head Screw (2) Depth Braces (Left & Right) (2) .250 x .500 Flat Head Screw (1) Width Bracket (4) Lock Washers Installation Instructions Step 1 Assemble Rack Sides: Secure the Vertical Post to the coresponding Depth Brace using the Flat Head Screw.
  • Page 3 Installation Instructions Step 3 Attach Width Bracket: Attach the Width Bracket to the sides of the Rack using (4) Pan Head Screws and (4) Lock Washers. Width Bracket Lock Washer Pan Head Screw Note: For added security and stability, remove the (4) Rubber Bumpers and secure the Rack to mounting surface using appropriate fasteners.
  • Page 4 Innovation First, Inc. warrants our products against defects in material and workmanship for a period of one (1) year from the date of purchase. Innovation First, Inc. liability shall be limited to repairing or replacing, at our option, any defective product.