Bottom Cover Installation

The cable-entry section of the bottom cover must be replaced following installation of the
grounding wire, feeder cable(s), and distribution cable(s). Use the following procedure to
replace the cable-entry section of the bottom cover:
1. Locate the bottom cover (cable-entry section) that was removed from the cabinet in step 2
of
Section
2. Determine which grommets will be used for sealing the cable entry/exit points and remove
those grommets from their mounting slots in the bottom cover.
3. Using a utility knife, cut through the slit that runs lengthwise down the center of each
grommet as shown in
4. Remove enough cable cutout sections from each grommet to accommodate the size and
number of cables that will pass through the grommet.
5. Install the grommets on the cables.
Note: More than one cable may have to pass though the same grommet.
6. Insert the grommets into their respective mounting slots in the bottom cover.
Page 32
© 2004, ADC Telecommunications, Inc.
5.1.
Figure
24.
BOTTOM
COVER
REMOVE CABLE
CUTOUT SECTIONS
CUT SLIT
Figure 24. Bottom Cover Installation
GROUNDING
WIRE
DETAIL DRAWIING
OF GROMMET
GROMMET
FEEDER
CABLE
DISTRIBUTION
CABLES
19609-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ace-142sAce-142v

Table of Contents