Attention & Maintenance - Kelley AQUASHIELD SYSTEM AQS-900 Series Installation Instructions Manual

Tufsteel galvanized steel framing
Table of Contents

Advertisement

 
ATTENTION & MAINTENANCE 
 
 
NOTICE
 
 
Periodic inspections of all dock Seal/Shelter is recommend.  Inspect for damage and contact your local distributor if parts 
are needed to be replaced.   
 
 
 
PERIODIC MAINTENANCE CHECKLIST 
 
Rips/tears in wiper pad fabric/cover 
Water leaks due to insufficient caulk 
Ensure steel head frame is plumb to building wall 
Ensure all fasteners are in position 
Ensure vinyl trim is secured to stop plate 
 
 
POST INSTALLATION CHECK LIST 
 
Head Frame is perpendicular to building wall 
Ensure all anchors & fasteners are secured correctly 
Confirm the head frame is caulked at building adequately 
Bottom of head frame is installed at correct dimension off finished grade 
Confirm caulk is applied to the back side of the stop plate  
Side cover is attached to tab on head frame bracket 
Confirm vinyl trim is secured to stop plate 
Ensure wiper pad is straight and does not bend 
 
 
NOTES 
 
 
MARCH 2019   
 
14
                                             T31636 – AQS‐900® 
 
 
                        
 
 
 
 
 
©2018 4FRONT ENTREMATIC

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Kelley AQUASHIELD SYSTEM AQS-900 Series

Table of Contents