ATTENTION & MAINTENANCE
NOTICE
Periodic inspections of all dock Seal/Shelter is recommend. Inspect for damage and contact your local distributor if parts
are needed to be replaced.
PERIODIC MAINTENANCE CHECKLIST
Rips/tears in wiper pad fabric/cover
Water leaks due to insufficient caulk
Ensure steel head frame is plumb to building wall
Ensure all fasteners are in position
Ensure vinyl trim is secured to stop plate
*
*
*
POST INSTALLATION CHECK LIST
Head Frame is perpendicular to building wall
Ensure all anchors & fasteners are secured correctly
Confirm the head frame is caulked at building adequately
Bottom of head frame is installed at correct dimension off finished grade
Confirm caulk is applied to the back side of the stop plate
Side cover is attached to tab on head frame bracket
Confirm vinyl trim is secured to stop plate
Ensure wiper pad is straight and does not bend
NOTES
MARCH 2019
14
T31636 – AQS‐900®
©2018 4FRONT ENTREMATIC