Dc Distribution Panel Checklist - Alcatel-Lucent 9966 Hardware Installation

Small cell gateway on atca platform
Table of Contents

Advertisement

Final Checklists
....................................................................................................................................................................................................................................

DC distribution panel checklist

Purpose
The following items must be completed prior to cabinet installation. Enter the correct letter for the corresponding
description item and add comments if required.
Table E-6
Item Description
1
2
3
4
5
6
7
8
9
11
....................................................................................................................................................................................................................................
E-12

DC distribution panel checklist

Yes(Y)
Is the power plant
installed as per the
floor plan?
Is the power plant
secured properly?
Is the equipment
grounded?
Are grounding
cable sizes correct?
Are external
alarms installed?
Is the cabinet
labelled?
Are power cables
routed as per
instructions?
Does the sub -
mains circuit
breaker that
supplies power
have adequate
capacity?
Are all connections
and contacts as per
engineering
guidelines and
configuration?
Have the correct
ratings for fuses
and circuit
breakers been
used?
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
No(N) N/A
Comments