Chapter 1 - Introduction
Carefully plan the integration of the device into an existing
system and ensure proper function of the system after
installation.
The device may only be installed or uninstalled by qualified,
trained electrical engineering personnel. When installing the
device, observe the regulations for handling electric
components in accordance with VDE 0100. In addition, you
must also observe the valid safety and accident prevention
regulations (UVV) when operating the device within the
jurisdiction of the Federal Republic of Germany.
Always install the device on a suitable top-hat rail (mounting rail).
Cables used for the connection must not apply any mechanical
forces to the device.
High temperature differences between the storage site and
installation site can result in condensation within the case, which
may cause the device to become damaged. In case of high
temperature differences, wait at least three hours before
operating the device.
6
Note
Never open the case of the device or carry out any
mechanical modifications on the device. This may lead to
damages on the device as well as to loss of warranty.
EMC note
The TH LINK contains electronic components sensitive
to electrostatic discharges. Damages due to electrostatic
discharge can lead to premature failure of components
or intermittent faults at a later stage. Before installing the
TH LINK, divert the electrostatic discharge away from
your body and the tools used.
TH LINK PROFINET - Installation Manual
Need help?
Do you have a question about the TH LINK PROFINET and is the answer not in the manual?