Advertisement

Quick Links

ES
Manual de instrucciones
IT
Istruzioni d'uso
GB
Operating instructions
FR
Instructions d´emploi
P
Manual de instruções
Área Empresarial Andalucía - Sector 1
C/ Sierra de Cazorla, 7
28320 - Pinto (Madrid) SPAIN
Email: sales@grupostayer.com
Email: info@grupostayer.com
VENTO25
www.grupostayer.com
GAS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GAS VENTO25 and is the answer not in the manual?

Questions and answers

Summary of Contents for stayer GAS VENTO25

  • Page 1 Manual de instrucciones VENTO25 Istruzioni d’uso Operating instructions Instructions d´emploi Manual de instruções Área Empresarial Andalucía - Sector 1 C/ Sierra de Cazorla, 7 28320 - Pinto (Madrid) SPAIN Email: sales@grupostayer.com Email: info@grupostayer.com www.grupostayer.com...
  • Page 2 FIG. 1 FIG. 2...
  • Page 3 FIG. 3 FIG. 4...
  • Page 4 ENGLISH 6.1. VENTO25 0.65 3000-9000 C.C. Km/h /min 12.2 dB(A) K=3db dB(A) K=1.5 m/s...
  • Page 5: Table Of Contents

    Please read the brochure that refers in detail to different Manual start of the motor. points evidencing its excellent performance. This will help you to achieve the best possible result with you STAYER blower. Emergency stop. 1. Contents First Aid.
  • Page 6 ENGLISH CLOTHING SAfETY AND INDIVIDUAL PROTECTION • Stop the motor when resting and when leaving the blower unattended. Place it at a safe location to avoid Pay special attention to the following measures damages to other persons, cause fire with combustible •...
  • Page 7: Instructions For Use

    ENGLISH 3. Instructions for start up 3.2 Illustrated description of functions 3.1 Positioning 1. ON/OFF switch. 2. Main handle. 3. Trigger. BASICS 4. Priming pump. • The equipment comes with a suction tube and with an 5. Air filter cover. impulsion tube, the first having a larger diameter than 6.
  • Page 8: Maintenance And Service Instructions

    ENGLISH - Smoothly pull the starter grip until noticing a resis- • Make sure that the dust bag is not twisted and tance (compression point). Then return the starter proceed to the dust collecting operation by pulling grip and pull strongly. The machine will start. the triggering lever.
  • Page 9: Cleaning And Maintenance

    STAYER. 5.7 Disposal and recycling Use of non-approved parts entails an increase of the risk of accidents and damages. STAYER would not accept any The machine, accessories and packaging should be responsibility for accidents or damages caused by the use sorted for environmental-friendly recycling.
  • Page 10: Regulations

    ENGLISH 6.2 EU declaration of conformity 6. Regulations The undersigned: STAYER IBERICA, S.A. 6.1 Technical Data With address at: Calle Sierra de Cazorla, 7 = Rated power input. Área Empresarial Andalucía - Sector 1 28320 PINTO (MADRID) = Load speed.
  • Page 11 Área Empresarial Andalucía - Sector 1 C/ Sierra de Cazorla, 7 28320 - Pinto (Madrid) SPAIN Email: sales@grupostayer.com Email: info@grupostayer.com www.grupostayer.com...

Table of Contents