Snap the loaded metal plme into the unit (as shown below, Option A). If required you con screw the melal plote into the box using lhe
screws
provided in the accessory
kit.(Option B)
Option A
Option B
5)
Roule Ihe cobles through the coble enlronce and secure it by placing the coble
tie
around Ihe cable ond through the feature on the side of the
box.
The coble tie should
be snug, but nol tight enough ta deform the fibre cable up
10
30· (762mm) of ftbre maybe stored in the unit as a service lop if reqUired for lerminmion and/or
lesting.
o
o
0
60)
Terminate the ftbre coble Dccording
10
the connedor manufadurer's recommendolions. Stare the lerminoted fibres as iIIustroted and insert inlo the appropriJ!te
adapters.
NOTE: When simple and duplex patch cords (zipconi) are instaRed in lire unit some instullers prefer to remove aU of the jacketing and kewor from the cables and
instoR lire conllectors according
10
lire manufadurers recommendations
for installation on 900 micron buffered fibre.
o
0
o
0
611)
When spliting
is
required position the splice proledor/mechanicol splice into the pre-moulded splice holders androute the cable as shown below.
Need help?
Do you have a question about the Box 601 and is the answer not in the manual?
Questions and answers