Hide thumbs Also See for IS-BOX:

Advertisement

Available languages

Available languages

Quick Links

Manual instructiuni
Instruction Manual
300349-04-12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IS-BOX and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for IVAR IS-BOX

  • Page 1 IS-BOX Manual instructiuni Instruction Manual 300349-04-12...
  • Page 2 Fig. 1 Fig. 2 IS-BOX 1 IS-BOX 2 IS-BOX 3 IS-BOX 4 300349-04-12...
  • Page 3: Fig.

    Pregătirea sistemului Conexiunile distribuitorului IS-BOX sunt 3/4 "EK, distanța centrală este de 40 mm. Distribuitoarele pentru apă rece și caldă au respectiv 4 și 3 ieșiri. Dacă este necesar, pentru fiecare distribuitor este posibil să se obțină o iesire suplimentară prin scoaterea dopurilor de la conexiunea din dreapta: în acest caz, filetul eliberat este de 1/2 "F.
  • Page 4: Is-Box

    Există două modalități posibile de a deschide și a închide robinetii distribuitoarelor în funcție de model: • IS-BOX 1 / IS-BOX 2. După îndepărtarea plăcii (9 din fig.2), utilizați cheia specială (8 din fig.2), prevăzută cu un cap hexagonal și clapetă pentru a întoarce cu ușurință...
  • Page 5 Preparing the System The IS-BOX manifold fi ttings are 3/4’’ EK, with a spacing of 40 mm. The manifolds for hot and cold water have 3 and 4 outlets respectively. Where appropriate, for each additional manifold, an additional outlet can be created by removing the caps from the fi tting on the right: in this case, the thread released is 1/2’’ F. The misalignment between the manifold gaps is 16.5 mm.
  • Page 6 There are two possible ways to open and close the manifold interception valves depending on the model: • IS-BOX 1 / IS-BOX 2. After removing the plate (9 in Fig. 2), use the corresponding key (8 in Fig. 2), with hexagonal slot and fins to turn the augers clockwise (closing) or anti-clockwise (opening).
  • Page 7 Hinweise sollten genauestens beachtet werden, damit etwaige Sach- und Personenschäden vermieden werden können. La instalación y la puesta en obra del sistema IS-BOX se efectúan exclusivamente por personal cualifi cado de acuerdo con los reglamentos nacionales y/o los relativos requisitos locales. Si el operador tuviera que efectuar intervenciones que comporten el peligro de contacto con el fl...
  • Page 8: Table Of Contents

    Fig. 6 IS-BOX 1 IS-BOX 3 Fig. 6.1 Fig. 5 IS-BOX 1 IS-BOX 2 IS-BOX 3 IS-BOX 4 Fig. 6.2 - A - - B - Fig. 5.1a Fig. 5.1b Fig. 6.3a Fig. 6.3b Fig. 7 IS-BOX 2 Fig. 5.2a Fig.

Table of Contents