FIXATION AFTER CONNECTION PIPES

1. After connection to pipes, fix the PMV Kit using the attached binding band so that it is held
closely to the gas pipe.
Binding band L
Binding band M
Heat insulating pipe
Refrigerant pipe
(Liquid side)
2. Set the hanging bolts for supporting pipes which are mounted at front and rear sides of PMV
Kit at within 1m intervals.
Hanging bolt
Binding band M
Binding band M
1 m or less
PMV Kit
10
Binding band L
Binding band M
Refrigerant pipe
(Gas side)
Heat insulating pipe
Refrigerant pipe
(Liquid side)
Hanging bolt
Refrigerant pipe