Pre-Installation Checkout And Site Survey; Pre Installation Checkout; Site Survey - TESA WS2900C-PRO Operation Manual

Professional weather station
Table of Contents

Advertisement

The following Quick Start Guide provides only the necessary steps to
install, operate the weather station, and upload to the internet, along
with references to the pertinent sections.
Step
1
Assemble and power up the Y shape sensor
2
Power up the display console and synchronize
with Y shape sensor
5
Mount the sensor array
3
Set date and time on console
4
Calibrate the relative pressure to sea-level
conditions (local airport) on console
6
Reset the rain to zero on console
7
Configure WiFi
8
Register and upload to Weather Server

4. Pre-Installation Checkout and Site Survey

4.1 Pre-Installation Checkout
Before installing your weather station in the permanent location, we
recommend operating the weather station for one week in a temporary
location with easy access. This will allow you to check out all the
functions, ensure proper operation, and familiarize you with the
weather station and calibration procedures. This will also allow you to
test the wireless range of the weather station.

4.2 Site Survey

Perform a site survey before installing the weather station. Consider
the following:
1. You must clean the rain gauge every few months and change
the batteries every 2-3 years. Provide easy access to the
weather station.
Required
Description
Optional
5
Section
5.2.1–5.2.3
5.4
5.2.4
6.4.5
6.4.3
6.4.8
8.1
9

Hide quick links:

Advertisement

Table of Contents
loading