Download Print this page

VENTOMAXX Z-WRG RONDO-Plus Assembly And Operating Instructions Manual

Decentralized room ventilation

Advertisement

Quick Links

Decentralized
Room Ventilation
according to DIN 1946- Part 6
measured according to DIN EN 20140-10 (former DIN 52210)
measured according to EN ISO 717-1; test bed according to EN ISO 140-1
tested in accordance with the principles of the building supervision´s conventions
for the sonic test beds; in agreement with NABau UA DIN 4109 Beiblatt 1 00.71.02.
General building supervision approval No. Z-51.3-247
With a
Control Unit
to control from 1 up to 6 devices
Safety Indication
Please read the following instructions carefully before the first operation of Z-WRG Plus.
You will gain important information in order to operate and service your new room
ventilator correctly. Ventomaxx excludes his liability, if the following references
are neglected.
Z-WRG RONDO-Plus
Assembly Instruction
Operating Guidelines
Ventomaxx InternationalGmbH
central
Vers. 1.25
Herzog Georg Platz 4
84028 Landshut
www.ventomaxx-international.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the Z-WRG RONDO-Plus and is the answer not in the manual?

Questions and answers

Summary of Contents for VENTOMAXX Z-WRG RONDO-Plus

  • Page 1 Please read the following instructions carefully before the first operation of Z-WRG Plus. You will gain important information in order to operate and service your new room ventilator correctly. Ventomaxx excludes his liability, if the following references are neglected. Z-WRG RONDO-Plus...
  • Page 2: Electronic Installation

    › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION Security Advices (p. 2) Assembly/ Installation Instruction (pp. 3 - 5) Page 3 General Assembly Prerequisites Page 4 Preparation of the Wall Opening/ Electrical Connection Page 5 Assembly of the Telescope Unit Type LAW, Straight Through the Wall Electronic Installation (pp.
  • Page 3 Ventomaxx! Always consider the notes of the device manufacturer/ machine supplier while using them. Do not forget to wear the recommended protective clothing and equipment (e.g.
  • Page 4 Preparation wall opening and electrical connection WRG RONDO Plus Original Dimensions Consistent with Z-WRG RONDO Plus Components Preparation of Assembly: Star- Shaped Connection 12 V Ventilation devices of the Z- WRG Plus series are operated via a central control unit. The necessary 12 V low potential voltage is also provided this way.
  • Page 5 In the lower part is an on-site seal between structual work construction ring Module Set and base plate facade cover required (eg aluminum adhesive tape; Ventomaxx sealing adhesive VX-FK); b) to avoid deformations on the housing tighten at the top of the hood and sides of a seal on the facade is necessary.
  • Page 6 In plaster facades we recommend a flat duct on insulation of approximately 30 mm. channel diffusion resistant and permanently elastic (Ventomaxx Installation Sealing Adhesive VX-FK) section vertical 6. Flat duct system within the covering...
  • Page 7 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION ATTENTION MAINS VOLTAGE! Installation has by suitably qualified personnel realize. ATTENTION - MAINS VOLTAGE! Installation has to be done by expert staff. Preparation of the room sided housing a) Press Unlocking on the housing and Lift front design cover Unlocking of Set the screwdriver here...
  • Page 8 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION End Assembly on the Room Side ATTENTION MAINS VOLTAGE! Installation has by suitably qualified personnel realize. ATTENTION - MAINS VOLTAGE! Installation has to be done by expert staff. Preparation of the room sided housing a) Press Unlocking on the housing and Lift front design cover Unlocking of...
  • Page 9 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION End Assembly on the Room Side 4. Push the system unit into the wall a) the coming of the circuit board plug (bottom left of the room-side plus housing) put down to make room for the insertion to provide b) First of the ceramic heat exchanger in the tube insert (until just before the tube end)
  • Page 10 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION 7. Closed electric cover Hook electric cover on the housing bottom and the separating web press until he perceptible locks Close cover electric 8 - 11 Insert filter a) the filter frame at the top of the two Filter fixations slide (Fig.
  • Page 11 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION Electronic Installation of the Central Control Unit ATTENTION 230 Volt Supply MAINS VOLTAGE! 68 mm Installation has to be carried out by expert staff 71 mm 9. Installation of the central control unit in gypsum plasterboards or flush mounted a) create a wall opening in the drywall or masonry (ca.
  • Page 12: Cleaning And Care

    For this we ask you for a voucher a receipt where the dates can be found in. Ventomaxx reserves the right to reject the warranty if the evidence for the purchase and/or installation is not provided.
  • Page 13 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION The illustration on the left side shows the Adjustable Air Flow Façade Covering of Guidance Roller design of the device in montage type LAW- Montage Type LAW- straight through the wall. straight through the wall High Performance Ceramic The operation of other montage types of Heat Exchanger...
  • Page 14 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION By pressing the ON/ OFF button for a short time you switch on the device. During switching on the active stations are shown briefly (2 sec.) via the corresponding LED. - LED off | device not connected/existing - LED on | device connected and active...
  • Page 15: Configuration Mode

    › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION Configuration Mode To get to the configuration mode, please press the ON button for about 7 sec.; as soon as you release the button you are in the configuration mode. This can also be observed by the shining Master- LED.
  • Page 16 › › Z-WRG RONDO PLUS MOUNTING INSTRUCTION Filter Exchange Display: After 4000 operating hours a filter exchange is shown by a flashing MASTER-LED. The MASTER_LED is flashing every 5 seconds and displays for a time period of 1.5 seconds the numbers of the ventilation devices (via LED) where the filter has to be exchanged.
  • Page 17 6 to 8 months. An Ventomaxx replacement filter can be ordered from inspection of the filter on dirt or soil Ventomaxx indicating the article number: thus should be carried out regularly.
  • Page 18 Z-WRG RONDO Plus Using the Z-WRG Plus series you realize requirement specific solutions flexibly and highly energy- efficient. Please contact us with your needs! Ventomaxx -International GmbH Germany Herzog Georg Platz 4 84028 Landshut Z- WRG RONDO Plus Decentralized Ventilation Technology info@ventomaxx-International.com...