Installation; Location Of The Base Station - REMEHA iBase RF-Base station User Manual

Table of Contents

Advertisement

Available languages

Available languages

3 Installation

3.1 Location of the Base station

The Base station is positioned on the wall near the boiler. Points to note:
-
Position the Base station in such a way that the boiler is not located between the
Base station and the iSense RF; doing so can negatively impact the connection
signal.
-
Position the Base station at least 1 metre from equipment with electromagnetic
emissions such as ventilation units, washing machines, dryers etc.
-
Position the Base station so that it has good reception.
To do this, use the signal strength indicator in the iSense RF. The signal strength can be
viewed via Menu > Information.
 iSense RF wireless range
The range of the iSense RF in buildings is generally 30 metres.
Note!
This value is purely an indication. The actual range of the RF signal depends strongly
on the local environment. Remember that the number of walls and ceilings (metal or
other wise) can have a (considerable) impact on reception. Other objects that contain
metal may also impact reception. These include mirrors and windows with a metal
coating, insulating films, tumble driers, washing machines, etc.
EN
23

Advertisement

Table of Contents
loading

Table of Contents