Download Print this page

Eastwood 30169 Instructions page 4

2 ton aluminum floor jack

Advertisement

MAINTENANCE
GENERAL
• Provide several drops of oil to pivot points periodically to prevent binding.
• Keep all areas of the jack clean particularly the hydraulic ram and sliding frame components.
• Before each use, check all hardware for tightness, all components for damage, hydraulic fl uid
leaks and rust or dirt on moving parts.
• Store in a clean & dry environment when not in use.
BLEEDING
With use your jack may accumulate some air in the hydraulic system which will hinder performance.
If this occurs, follow the bleeding procedure outlined in the Initial Set Up section of this manual.
ADDING OIL
1. Remove the two Oil Fill Screws at the
rear of the jack body (Fig A). Do not
move the jack handle while the Oil Fill
Screws are removed.
2. Fill with high quality hydraulic jack oil until
the oil reaches the top of the fi ll holes.
3. Replace the Oil Fill Screws and follow the
bleeding procedure outlined in the Initial
Set Up section of the manual.
If you have any questions about the use of this product, please contact
The Eastwood Technical Assistance Service Department: 800.544.5118 >> email: techelp@eastwood.com
PDF version of this manual is available online >> eastwood.com/30169manual
The Eastwood Company
© Copyright 2015 Easthill Group, Inc.
263 Shoemaker Road, Pottstown, PA 19464, USA
US and Canada: 800.345.1178
Fax: 610.323.6268
FIG. A
Outside US: 610.718.8335
eastwood.com
1/15
Instruction part #30169Q
Oil Fill Screws
Rev 0

Advertisement

loading