IBM System p Series Cabling Manual page 43

Hide thumbs Also See for System p Series:
Table of Contents

Advertisement

Routing the cables through the cable-management arm
__
Route the cables through the hooks that are located along the cable-management arm and secure them with
the straps that are provided, as shown here:
__
After attaching the cables to the cable-management arm, go to the front of the rack and move the system
drawer in and out. Observe the cables and cable-management-arm movement to verify that the cables are
not binding.
Starting your server
__
Plug in your server or uninterruptible power supply and attached expansion units.
__
Open the control panel door on the front of the server. The control panel should be lit and display 01 N V=F. The
server is not yet powered on.
Note:
1. Expect a delay between the time when power is applied to the server or workstation and when an initial
program load (IPL) can be performed. When power is initially applied to the server or workstation, the
service processor performs a self-check and will leave the control panel blank for up to two minutes. Wait
until the C1XX XXXX progress codes are completed and 01 is displayed on the control panel before you
perform an IPL or change control panel functions.
2. If 01 N V=F is not displayed, you might need to change the mode. To change the mode, see Access control
panel functions in the iSeries Information Center.
__
When prompted, enter a new HMC access password. This password is case sensitive.
__
Press the white Power On button. There is a short delay of approximately 5 to 20 minutes until the server
powers on. When the server powers on, the control panel displays 01 B N V=F. If the control panel displays A900
2000, the console is not connected yet.
37
Cabling your server

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

System i seriesSystem i5System p5

Table of Contents