IBM System p Series Cabling Manual page 31

Hide thumbs Also See for System p Series:
Table of Contents

Advertisement

Connecting the power cords
__
If your server is equipped with a retention bracket, route the power cord under the bracket before you
plug it into the back of the server, as shown here:
__
Are you installing an uninterruptible power supply?
__ No. Connect the server power cords to the server. Do not plug the power cord into the power outlet. Do not
start your server.
__ Yes. To complete the installation of the uninterruptible power supply, see the Powerware Web site
(www.oem.powerware.com/ibm-ups/Products/9910Solutions/ina.asp)
Connecting the external cables
__
Use the table in "Cables and adapters" on page 163 to connect the cables to the matching adapters on the back
of your server.
Note: If the cable did not come with your server, you will have to supply it.
Routing the cables through the cable-management arm
__
Is your server installed in a rack?
v No. Proceed to the next section, Starting your server.
v Yes. Do the following:
__
Put the system into the service position. See Place the rack-mounted system or expansion unit in the service
position.
.
Cabling your server
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

System i seriesSystem i5System p5

Table of Contents