INSTALLATION INSTRUCTIONS
1. Install supplied J-bolt anchor assembly
pad pour form [by others]. The electrical supply conduit stub-outs
bracket
of the J-bolt anchor assembly
C
NOTES:
Electrical supply conduit stub-outs
recommended 12" (305mm) minimum length.
Maximum conduit stub-out number and size: Two (2)- ¾" (25mm) conduit stub-outs or three (3)- ½" (20mm) conduit
stub-outs.
The concrete pad pour form should be a minimum of 9" across the top in any direction and a minimum of 18" deep.
2. Orient the J-bolt anchor assembly
when the bollard is installed.
NOTES:
For proper bollard installation, the top of the template bracket
See reverse side of this sheet for recommended J-bolt anchor assembly orientation.
3. Fill the concrete pad pour form [by others] with concrete [by others] to the top surface of the template bracket
For best results, ensure that top surface of concrete is smooth and level.
NOTES:
For proper bollard installation, the Anchor Bolt Top Fasteners
These will be used later to secure the bollard 3100 bollard to the J-bolt anchor assembly.
4. Allow concrete pad to cure securing J-bolt anchor assembly
NOTES:
Protect J-bolt and conduit stub-outs from damage prior to installation of 3100 bollard fixture.
See 3100 Bollard Installation Instructions for complete assembly.
J-BOLT ANCHOR INSTALLATION
E
B
C
A
©2006 Hydrel
Rev. 7/10/06
INS-3100_RD_J-BOLT_rev1
over electrical supply conduit stub-outs
A
.
A
should be no higher than 3" (76mm) above grade with supply wires at a
B
to ensure that the access door
A
Supply Wires
D
12" (305 mm)
Minimum Length
A
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT
NOTICE. Any dimension on this sheet is to be assumed as a reference
dimension: "Used for information purposes only. It does not govern
manufacturing or inspection requirements." (ANSI Y14.5-1973)
3100 BOLLARD
Installation should be performed by a licensed
electrician in accordance with the National Electrical Code
and relevant local codes.
[by others] and into a concrete
B
must pass through the center of the template
B
of the 3100 bollard is in the desired location
E
must be flush and level with final grade.
C
must be above grade and removable.
D
into the pad before installing 3100 series bollard fixture.
A
Conduit Stub-outs
3" (76 mm)
B
Maximum Height
D
C
Concrete
18" (457 mm)
Minimum Depth
3110, 3120
.
C
A
J-Bolt Assembly
B
Electrical Conduit
Stub-Out
Anchor
C
Template Bracket
D
Anchor Bolt
Top Fasteners
E
Access Door
12881 Bradley Ave
Sylmar, CA 91342
Phone: 818-362-9465
Fax: 818-362-6548
www.hydrel.com
Need help?
Do you have a question about the 3100 Series and is the answer not in the manual?
Questions and answers