Prier P-118 Installation Instructions

Hot & cold wall hydrant

Advertisement

Installation:

1. Determine the location for the installation of the hydrant. The valve must be installed into a
heated area of the structure that will not drop below freezing. Ensure there is adequate work
room in the interior of the structure for securing the hydrant to the plumbing system (hot and
cold).
2. Prepare the mounting surface and entry hole. The P-118 requires a vertical and smooth
mounting surface to ensure proper installation and draining. Depending on the surface the
hydrant will be mounted, a mounting block may be required to provide the vertical and smooth
mounting surface. Mounting blocks can be purchased or made on-site with a piece of wood or
other materials on hand.
3. Bore a 2" hole through the wall (and mounting block if using one) in the desired position for the
installation.
4. Center and level the mounting bracket with the 2" hole and attach to structure with the (4) - 1"
supplied screws. Depending on the substrate, you may want to drill a pilot hole. The tab with
a hole in it needs to be positioned at the bottom.
Step 4: Tab with hole positioned at 6 o'clock
Installation Instructions for PRIER
P-118 Hot & Cold Wall Hydrant

Tools Required:

2" Hole Saw
Level
Power Screwdriver/Drill
(or Phillips screwdriver)
800-362-9055 Fax: 800-362-1463
PEX Connection:
PEX Crimp or Clamp tool
Crimp or Clamp rings
Soldered Connection:
Soldering Torch, Solder, Flux
Step 4 cont'd: Ensure mounting bracket is level
PRIER Products, Inc.
4515 E 139th St.
Grandview, MO 64030

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P-118 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Prier P-118

  • Page 1 (hot and cold). 2. Prepare the mounting surface and entry hole. The P-118 requires a vertical and smooth mounting surface to ensure proper installation and draining. Depending on the surface the hydrant will be mounted, a mounting block may be required to provide the vertical and smooth mounting surface.
  • Page 2 Inspect the hydrant and connection points inside the house for leaks. Operation: Operation of the P-118 Freezeless Hot/Cold Wall Hydrant is a simple process. Water flows through the hydrant when the larger handle is turned counter-clockwise. Turn off the hydrant by turning the handle clockwise to the ‘OFF’...
  • Page 3 362-9055. Maintenance: The PRIER P-118 Hot/Cold Wall Hydrant leaves the factory fully tested and operational. It is treated with an FDA approved lubricant where needed. The hydrant requires no scheduled maintenace to provide long life. If a problem does arise, all the serviceable components are offered in repair kits.

Table of Contents