Download Print this page

Galvin Engineering ClevaCare CLEVA010 Installation Manuallines page 4

Healthcare shower arm

Advertisement

5. Check Shower for operation and leaks
Check the hose is securely connected. Turn on
water supply, the shower should now be
working. Once installation is completed and the
unit must be tested for any leaks.
Notes:
1. To comply with backflow prevention
standards, the hand spray must hang at
least 55mm above the floor provide an 'air-
gap' (See Figure 1 and 2). If the hand piece
lies on the floor, then an appropriate
backflow prevention device must be
installed.
2. Figure 3 shows a Clevakit typical installation
conforming to AS1428.1-2009.
Version 1, 31 October 2019, Page 4 of 5
Figure 3
Clevakit typical installation
Conforming to AS1428.1-2009

Advertisement

loading