Summary of Contents for Galvin Engineering ClevaCare CLEVA010
Page 1
Health Department and Standards Australia. Hoses with swivel connections are preferred and stainless steel braided hoses are not recommended. IMPORTANT: All Galvin Engineering taps are tested in accordance with AS/NZS 3662 and leave our premises in good working order.
PRE- INSTALLATION Version 1, 31 October 2019, Page 2 of 5 MOUNTING DETAILS − If the mounting holes do not already exist, mark out and drill the holes in the bench/trough, as shown in rough-in dimensions. Figure 1 Typical Mounting Distance from the floor Figure 2 Typical Retrofit Installation...
Page 3
Version 1, 31 October 2019, Page 3 of 5 INSTALLATION INSTALLATION COMPLIANCE: Galvin Engineering products must be installed in accordance with these installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or state standards.
Page 4
Version 1, 31 October 2019, Page 4 of 5 5. Check Shower for operation and leaks Check the hose is securely connected. Turn on water supply, the shower should now be working. Once installation is completed and the unit must be tested for any leaks. Notes: 1.
The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, express or implied. Galvin Engineering Pty. Ltd. hereby specifically disclaims all other warranties, express or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose.