About rigging and installation The BAC equipment should be rigged and installed as outlined in this bulletin. These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with the procedures to be followed and to assure that all necessary equipment will be available at the job site. Recommended maintenance and monitoring programme Checks and adjustments...
Table of contents RIGGING AND INSTALLATION INSTRUCTIONS General information About engineering and application practices Shipping Inspection Before Rigging Unit weights Leveling Connecting pipework Coil connections Freeze protection Safety precautions Non-walking surfaces Modifications by others Warranty Rigging General notes Support requirements Recommended rigging method for 3,2 m long units Recommended rigging method for 6 m long units System charging...
TSU-M GENERAL INFORMATION About engineering and application practices This bulletin only refers to the assembly of the unit. To ensure a proper operation, a correct integration of the unit in the overall installation is mandatory. For good engineering and application practices on layout, levelling, connecting pipework, etc., please refer to our website: http://www.baltimoreaircoil.eu/knowledge- center/application-information.
Unit weights Before rigging any BAC equipment, the weight of each section should be verified on the unit certified drawing. Refer to the Rigging section for weight values. These weights are approximate only and should be confirmed by weighing before lifting when available hoisting capacity provides little margin for safety.
Coil connections Coils of BAC ice thermal storage units are filled with a low pressure inert gas at the factory before shipping, to ensure an optimal internal corrosion protection. It is recommended to check the overpressure every six months (connect a manometer to the valve). On site, the pressure needs to be released from the coil.
AUTHORIZED PERSONNEL The operation, maintenance and repair of this equipment should be undertaken only by personnel authorized and qualified to do so. All such personnel should be thoroughly familiar with the equipment, the associated systems and controls and the procedures set forth in this and other relevant manuals. Proper care, personal protective equipment, procedures and tools must be used in handling, lifting, installing, operating, maintaining and repairing this equipment to prevent personal injury and/or property damage.
Warranty BAC will guarantee all products to be free from manufactured defects in materials and workmanship for a period of 24 months from the date of shipment. In the event of any such defect, BAC will repair or provide a replacement. For more details, please refer to the Limitation of Warranties applicable to and in effect at the time of the sale/purchase of these products.
TSU-M RIGGING General notes 1. Lifting and transportation of the equipment by means of forklifts is not permitted, as this may result in serious damage of the tank bottom and the ice coils. 2. Lifting devices have been provided for short lifts and final positioning. 3.
Recommended rigging method for 3,2 m long units Recommended rigging method for 3,2 m long units (TSU-L184M & TSU-237M) 1. Safety slings ( for extended lifts) Recommended arrangement for rollers used for final positioning 1. 4 Rollers required (2 each side) 2.
Recommended rigging method for 6 m long units Recommended rigging method for 6 m long units 1. Safety slings (for extended lifts) 2. Lifting ear 3. Lifting cable Recommended arrangement for rollers used for final positioning 1. 4 Rollers required (2 each side) 2.
CAUTION Do not use uninhibited glycols or antifreeze solutions intended for automotive use. The glycol solution should be premixed in a tank before being added to the system. This provides a uniform mixing and eliminates the concern of water pockets that could freeze and cause system damage. If the solution is to be mixed on site, be sure to use good quality dilution water and follow the manufacturer's directions.
TSU-M INSPECTION PRIOR TO START-UP General Prior to start-up, the following services, which are described in detail in the Operating and Maintenance Manual (see table "Recommended maintenance and monitoring programme" ) must be performed. Proper start-up procedures and scheduled periodic maintenance will prolong the life of the equipment and ensure trouble-free performance for which the unit is designed.
TSU-M FURTHER ASSISTANCE & INFORMATION Balticare BAC has established a specialized independent total care company called Balticare. The BAC Balticare offering involves all elements required to ensure a safe and efficient operation of your evaporative cooling products. From a full range of risk assessment to selective water treatment, training, testing, record keeping and annual system overview.