Wenger StageTek Guardrail Assembly & Operating Instructions

Advertisement

For Replacement Parts and more detailed product information,
CAUTION
Make sure anyone assembling
or installing the StageTek
component has read and
understands the instructions.
A
W
SSEMBLY
To assemble the Guardrail without the optional Infill Panels, attach Rails to the top, middle and
bottom positions of both Upright Weldments using 3/8-16 x 3-3/4" Carriage Bolts, Tube Saddles
and 3/8-16 Acorn Nuts as shown.
Top
Rail
Middle
Rail
Bottom
Rail
Visit the StageTek web page at www.wengercorp.com
for detailed instructions and videos.
Note: Please read and understand the instructions before starting the assembly or installation.
Note: If you need additional information, contact Wenger Corporation using the information below.
©Wenger Corporation 2013
Wenger Corporation, 555 Park Drive, P.O. Box 448, Owatonna, Minnesota 55060-0448
Questions? Call.....USA: 800-4WENGER (493-6437) • Worldwide: 1-507-455-4100 • www.wengercorp.com
Basic Instructions only!
refer to the StageTek
Always comply with Warnings
or Cautions in the instructions
or posted on the equipment.
O
I
ITHOUT
PTIONAL
Assembly/Operating Instructions
Owner's Manual 280A099.
CAUTION
P
NFILL
ANELS
Tube Saddle
Orientation
Tube
Saddle
3/8-16 x 3-3/4"
Carriage Bolt
Printed in USA 04/13
StageTek
CAUTION
Guardrails are recommended
for instances where the deck
height is 12" (30 cm) or more.
3/8-16
Upright
Acorn
Weldment
Nut
Guardrail
End Caps
may need to
be installed
in Rail Ends
Part #281A442-03

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the StageTek Guardrail and is the answer not in the manual?

Questions and answers

Summary of Contents for Wenger StageTek Guardrail

  • Page 1 Visit the StageTek web page at www.wengercorp.com for detailed instructions and videos. Note: Please read and understand the instructions before starting the assembly or installation. Note: If you need additional information, contact Wenger Corporation using the information below. ©Wenger Corporation 2013 Printed in USA 04/13 Part #281A442-03 Wenger Corporation, 555 Park Drive, P.O.
  • Page 2 SSEMBLY PTIONAL NFILL ANELS To assemble the Guardrail with the Optional Infill Panels: 1. Attach a Rail to both the top and bottom positions of both Upright Weldments using 3/8-16 x 3-3/4” Carriage Bolts, Tube Saddles and 3/8-16 Acorn Nuts as described on the previous page.
  • Page 3 SSEMBLY PTIONAL NFILL ANELS CONTINUED Tube 5. Attach the Middle Rail to both Saddle Upright Weldments using a 3/8-16 x 3-3/4” Carriage Bolt 3/8-16 Acorn Nut through the Tube Saddle and an 3/8-16 Acorn Nut as previously described. Middle Rail 3/8-16 x 3-3/4”...
  • Page 4 PERATION To attach the Guardrail to the stage deck: 1. Be sure that the Lower Slide at the base of both Upright Weldments are in the Open Position. Lower Slide Knob To move the Lower Slide to the Open Position: Pivot Closed Position Lock...

Table of Contents