RVR Energy Technology Star NE Installation, Operation And Maintenance Manual

Pellet boiler

Advertisement

Quick Links

Installation, operation and maintenance
RVR
Energy Technology Experts
RVR Energy Technology Limited
(
(
ROI
UK
Pellet boiler
Star
TEMPERATURE
RESET
PRESSURE
OVERHEAT
(
)
INT
NE
Star
Star
NE
NE
THERMOSTAT
MAIN SWITCH
2009-03
VB THL product Nº

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Star NE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RVR Energy Technology Star NE

  • Page 1 Installation, operation and maintenance Pellet boiler Star Star Star TEMPERATURE RESET THERMOSTAT MAIN SWITCH PRESSURE OVERHEAT 2009-03 Energy Technology Experts VB THL product Nº RVR Energy Technology Limited...
  • Page 2 Contents Star 2009-03 Function ................. 2 Control panel ................. 7 Technical data ............... 3 Operation and care ............... 7 Commissioning and checks Hot water capacity Water pressure in the system HVAC installation ..............4 Bleeding/topping up System principle Dirt fi lter Flue pipe Circulation pump Expansion system...
  • Page 3: Technical Data

    Technical data Star 2009-03 Boiler class 3, acording to EN 303-5. Weight empty Max temp 100 °C Power 15- 20 kW fi lled Manufactured to 97/23/EC Article 3.3 Draught required 0.05 mbar Volume boiler litre Voltage 230 V~, 50 Hz heat exchanger litre Current...
  • Page 4: Hvac Installation

    HVAC installation Star 2009-03 Shunt The boiler must be installed by a qualifi ed and competent person, in accordance with the relevant clauses of all applicable standards and The shunt is controlled manually by turning the dial to a suitable recommendations.
  • Page 5 HVAC installation Star 2009-03 • fl ue duct ventilation Pellet burner • drier fl ue gases, reducing the risk of condensation The burner hatch of the boiler is designed for operation of the The draught regulator setting depends on the design of the fl...
  • Page 6: Electrical Installation

    Electrical installation Star 2009-03 Pellet burner The electrical installation must be carried out by a qualifi ed and compe- tent electrician, in accordance with IEE regulations. All other relevant Most pellet burners require standards and codes of practise must also be adhered to. a phase supply, terminal F, An all-pole main circuit breaker must be installed ahead of the boiler.
  • Page 7: Control Panel

    Control panel Star 2009-03 1. Thermostat. Setting of boiler temperature during burner operation. Recommended setting min 70 °C. 23. Main switch, which breaks the control current to the Star Star boiler, as well as units powered by the boiler. 52. Resetting, overheating protection. Resetting may take place when the boiler temperature has fallen to approx.
  • Page 8: Troubleshooting

    Heat exchanger 23 22 01 Combustion plate 24 05 50 Angled ball valve 29 55 13 Burner pipe 26 02 11 Flow switch 30 00 34 Hatch gasket 37 00 61 Plastic dial M6 Energy Technology Experts RVR Energy Technology Limited...

Table of Contents