Download Print this page
Panduit FK2BJ Installation Instructions

Panduit FK2BJ Installation Instructions

Opticom furcation kit

Advertisement

Quick Links

© Panduit Corp. 2006
CONTENTS
FK2BJ
INCLUDES: TWO 1-METER FURCATION
TUBES AND ONE 3" X1/4" DIAMETER
HEAT SHRINK TUBE
For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
OR
PRECAUTIONS
1. SAFETY GLASSES
WARNING: It is strongly recommended that
safety glasses be worn when handling bare
optical fiber. The bare fiber is very sharp and
can easily damage the eye.
2. DISPOSAL OF BARE FIBERS
WARNING: Pick up and discard all pieces of
bare fiber with sticky tabs. Do not let cut pieces
of fiber stick to clothing or drop in the work
area where they are hard to see and can
cause injury.
3. LASER LIGHT PROTECTION
WARNING: Laser light is invisible. The invisi-
ble light is powerful enough to damage your
eyes. Serious damage to the retina of the eye
is possible. Never look into the end of a fiber
which may have a laser coupled into it. Should
accidental eye exposure to laser light be sus-
pected, arrange for an eye examination imme-
diately.
4. CABLE HANDLING
WARNING: Fiber optic cable can be damaged
by excessive pulling, twisting, crushing or
bending stresses. Consult the appropriate
specification sheets as provided by your cable
vendor. Any damage may result in decreased
optical performance.
O
Furcation Kit
PTICOM
Part Numbers: FK2BJ, FK4BJ
PN155B
INCLUDES: FOUR 1-METER FURCATION TUBES AND
ONE 3" X3/8" DIAMETER HEAT SHRINK TUBE
Page 1 of 4
FK4BJ
TOOLS
CABLE JACKET
STRIPPER (CST-115)
ARAMID YARN
CUTTER (FKC)
HEAT GUN
(HSG-115V-300)
MARKING PEN
(PFX-0)
UTILITY KNIFE
TAPE MEASURE

Advertisement

loading

Summary of Contents for Panduit FK2BJ

  • Page 1 Furcation Kit PTICOM Part Numbers: FK2BJ, FK4BJ INSTALLATION INSTRUCTIONS PN155B © Panduit Corp. 2006 CONTENTS FK2BJ FK4BJ INCLUDES: TWO 1-METER FURCATION INCLUDES: FOUR 1-METER FURCATION TUBES AND TUBES AND ONE 3” X1/4” DIAMETER ONE 3” X3/8” DIAMETER HEAT SHRINK TUBE...
  • Page 2 AND FIBER REQUIRED FOR THE CONNECTOR. (SEE CONNECTOR INSTALLATION INSTRUCTIONS) 0.5in (12.7mm) DRAW AN ‘X’ ON THIS SECTION (THIS WILL BE CUT OFF) MARK ALL FURCATION TUBES THAT WILL BE NEEDED FURCATION TUBING For Technical Support: www.panduit.com/resources/install_maintain.asp Page 2 of 4...
  • Page 3 INSTALLATION INSTRUCTIONS PN155B CUT FURCATION TUBING TO SIZE FURCATION TUBING STRIP OUTER JACKET CUT INNER TUBE FLUSH WITH EACH END OF JACKET SLIDE FURCATION TUBING OVER THE BUFFERED FIBERS For Technical Support: www.panduit.com/resources/install_maintain.asp Page 3 of 4...
  • Page 4 TERMINATE WITH AN APPROPRIATE CONNECTOR F (121 EVENLY HEAT THE TUBING UNTIL IT HAS FULLY RECOVERED AND CONFORMS TO THE CABLES. E-mail: For Instructions in Local Languages cs@panduit.com and Technical Support: Fax: www.panduit.com/resources/install_maintain.asp www.panduit.com (708) 444-6993 Page 4 of 4...

This manual is also suitable for:

Fk4bj