Download Print this page
Posh Solus Mk3 Installation Instructions

Posh Solus Mk3 Installation Instructions

Rail shower 1 function chrome

Advertisement

Quick Links

Posh Solus Mk3 Rail Shower 1 Function Chrome (4*)
Important Installation Considerations
1. NOTE: Some showers may not provide an effective shower when used
with gravity fed heated water systems or where pressures are less
than 150kPa at the outlet. Additionally showers with flow rates of less
than 9L/min may not allow the following to function correctly:
_ some instantaneous water heaters
_ some tempering valves
_ some thermostatic mixing valves
2. Some shower heads only operate correctly when hot and cold water
supplies are both mains pressure and may not be suitable for some
instantaneous hot water services.
3. When water pressure is in excess of 500kPa a pressure limiting device
is required in accordance with AS/NZS 3500 1.12 recommendation
Methven warrants this product against manufacturing defects and that it is suitable for use
under the general operating conditions specified in this instruction sheet. However, regional
IMPORTANT: Please read all of the
regulations apply and may affect your warranty. Please refer to
customer service for full details.
instructions before installation.
General:
New Zealand
0800 804 222
*This product must be installed in
1300 638 483
compliance with all relevant regional
regulations.
98-0284
It is the responsibility of the installer to
ensure a waterproof seal is achieved
between the product and mounting
surface. If in doubt about the quality of
the seal, remove the product and
reinstall using silicone to ensure a seal is
achieved.
All pipe work must be thoroughly flushed
prior to the installation of the hose.
After installation all connections must be
checked for leaks.
All outlets used primarily for personal
hygiene shall deliver water at a safe
temperature as per regional regulations.
Step 1
Remove chrome caps from each pillar.
Mount the top and bottom pillars in desired
position with the screws and wall plugs.
Check the mounts are vertically aligned.
Plumbers, please ensure a copy of the Installation
Instructions are left with the end user for future reference
Australia
Australia
1300 638 483
Rubber Bush
Screw
Brass Nut
UK
0800 195 1602
0800 195 1602
Chrome Cap
ISSUE A
Slider
DECEMBER 2015
DECEMBER 2015
Elbow
(if supplied)
Chrome Cap
TWIN SHOWER
TWIN SHOWER SYSTEM
Installation Guid
Installation Guide
Installation Instructions
Technical Specifications:
Technical Specifications:
Operating Pressure:
Operating Pressure:
Min: 150kPa/1.5bar
Min: 150kPa/1.5bar
Max: 500kPa/5.0bar*
Max: 500kPa/5.0bar*
Optimum: 150kPa/1.5bar - 500kPa/5bar
Optimum: 150kPa/1.5bar - 500kPa/5bar
Recommended installation of pressure
Recommended installation of pressure limiting
valve if supply exceeds 500kPa
valve if supply exceeds 500kPa
Operating Temperature:
Hot: Max 80°C*
Cold: Min 5°C
Inlet Connections:
Operating Temperature:
All ½" BSP
Hot: Max 80°C*
Cold: Min 5°C
NOTE:
NOTE:
Inlet Connections:
- After installation all connections must
- After installation all connections must be
All ½" BSP
checked for leaks
checked for leaks
- All installations must be carried out in
- All installations must be carried out in
compliance with relevant water regula
compliance with relevant water regulations*.
* Regional specific regulations apply.
* Regional specific regulations apply.
Please refer to your warranty statement
Please refer to your warranty statement at
www.methven.com
www.methven.com
UK
Wall Plug
ISSUE A
Rail
97-2821
Apr-2018
Step 2
Insert the rail, sli
into place.
Fix the rail in plac
bush and brass n
Replace chrome
Step 3
To adjust slider p
unlock and and r
the slider.
Page 1 of 3

Advertisement

loading
Need help?

Need help?

Do you have a question about the Solus Mk3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Posh Solus Mk3

  • Page 1 Min: 150kPa/1.5bar Min: 150kPa/1.5bar Max: 500kPa/5.0bar* Max: 500kPa/5.0bar* Optimum: 150kPa/1.5bar - 500kPa/5bar Posh Solus Mk3 Rail Shower 1 Function Chrome (4*) Optimum: 150kPa/1.5bar - 500kPa/5bar Recommended installation of pressure Recommended installation of pressure limiting valve if supply exceeds 500kPa valve if supply exceeds 500kPa...
  • Page 2 • After installation all connections must be checked for leaks. Step 3 • All outlets used primarily for personal • To adjust slider p hygiene shall deliver water at a safe unlock and and r temperature as per regional regulations. the slider.
  • Page 3 SOLUS M Elbow Installation (if supplied): Installati Step 1 Wall lining hole should be cut or finished as per • the dimension shown in the diagram on the right. Technical Spe • Cut off the threaded nipple 10±2mm from the wall 26mm max lining and apply thread seal tape to ensure a Inlet Connection...