Glasdon GLENWOOD 170 POST Installation And Maintenance Instructions

Advertisement

Glenwood
Installation and Maintenance Instructions
IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE
Please also refer to the 'Manual Handling Operations Regulations 1992' during the handling of the
product and materials used for installation. Glasdon recommends that a full Health and Safety analysis is
GLENWOOD 170 POST -
EXTENDED BASE MODEL (Concrete-in)

KIT CONTENTS:

ITEM 1 - Glenwood 170 Post
GLENWOOD 170 POST C/W
GLENWOOD SOCKET
KIT CONTENTS:
ITEM 1 - Glenwood 170 Post
ITEM 2 - Key Hole Plug
ITEM 3 - Socket Key
ITEM 4 - Glenwood Socket

EQUIPMENT REQUIRED:

- Excavation equipment
- Tape Measure
- Concrete Mix (we suggest using a quick setting
concrete i.e. QC10 for all installations)
- Safety Equipment (hard hat, mask, goggles,
reflective clothing, etc)
OPTIONAL BLANKING PLATE:
See page 5 for
Instructions
carried out prior to installation.
x 1
x 1
x 1
x 1
x 1
Page 1
170 Post
DIAGRAM NOT TO SCALE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GLENWOOD 170 POST and is the answer not in the manual?

Questions and answers

Summary of Contents for Glasdon GLENWOOD 170 POST

  • Page 1 IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE Please also refer to the ‘Manual Handling Operations Regulations 1992’ during the handling of the product and materials used for installation. Glasdon recommends that a full Health and Safety analysis is carried out prior to installation.
  • Page 2 And turn anti-clockwise until removed. GLENWOOD SOCKET INSTALLATION INSTRUCTIONS See our website for a video guide - www.glasdon.com Remove the key hole plug by following step Push the key inwards and lift the post to 1 & 2 of ‘Security Hole Plug’ instructions.
  • Page 3 Use a spirit level to ensure the top of the Fill the hole with concrete. Ensure concrete is socket is level and flush with the ground. Add/ flush with the top of the socket. remove gravel as required to level. Smooth the surface and allow concrete to dry for at least 24 hours.
  • Page 4 GLASDON cannot be held responsible for claims arising from incorrect installation, unauthorised modifications or misuse of the product. Stock No. C000/0525 - DWG No. 11B-055-17 Issue 1 - April 2019 © Copyright April 2019 Glasdon UK Ltd reserve the right to alter specifications without prior notice. Page 4...