Page 1
"Microbox" Continuous Mechanical Extract Ventilation Units Installation, Operating and Maintenance Instructions • 5 models • rectangular and/or round spigots • domestic and commercial use...
Page 2
ALL LIABILITY FOR DAMAGE CAUSED TO PERSONS OR PROPERTY DUE TO IMPROPER USE WITH REFERENCE TO THE PRECAUTIONS OUTLINED IN THIS MANUAL. THIS MANUAL MUST ALWAYS BE READILY AVAILABLE. THE RANGE MBOX204/2: 204mm x 60mm spigot, for dwellings up to 66m , max capacity 191m MBOX100/2: 4"/100mm spigot, for dwellings up to 66m...
VATED, THE FAN MUST BE DISCONNECTED FROM THE MAINS ELECTRICITY SUPPLY. THIS WILL ALLOW THE OVERLOAD DEVICE TO RE-SET. AFTER A BRIEF PERIOD, THE FAN CAN BE RE-STARTED. IF THE FAULT PERSISTS, CONSULT VECTAIRE FOR FURTHER ADVICE. OPERATION 1. The Microbox is suitable for ceiling or wall installation (Fig. A) 2.
Page 4 CLEANING AND MAINTENANCE 1. Before carrying out any maintenance or cleaning operations the mains electrical supply MUST be disconnected. 2. CLEANING AND MAINTENANCE SHOULD BE CARRIED OUT BY A QUALIFIED PERSON 3. Disconnect the terminal block (Fig. 11) before attempting to remove the motor impeller assembly. 4.