Operating Instructions Maxis XD10 ® EXTREME Duty Puller 2017 CAUTION: Please READ and UNDERSTAND all of the instructions 1/17 and safety information in this manual and observe safe-working XD10 Manual (V2) practices before operating or servicing this tool. ENG f and b covers...
8.5H x 5.5”W SAFETY FIRST Safety is essential in the use and maintenance of Southwire Contractor BEFORE OPERATING THIS TOOL, READ AND Equipment. This instruction manual and any markings on the tool UNDERSTAND ALL OF THE INSTRUCTIONS provide information for avoiding hazards and unsafe practices AND SAFETY INFORMATION IN THIS MANUAL related to the use of this tool.
8.5H x 5.5”W DESCRIPTION OF OPERATION SETUP AND OPERATION The Maxis XD10 is a cable puller intended to pull medium to large ® ASSEMBLY wire through conduit. It sets up in only minutes and will pull up to Puller is shipped almost fully assembled. 10,000 pounds.
Page 4
8.5H x 5.5”W SETUP AND OPERATION SETUP AND OPERATION ATTACHING CONDUIT ADAPTORS cont. ATTACHING CONDUIT ADAPTORS cont. 5. For most underground pulls the To change Front Roller Pivot position, loosen 15/16” bolts (Fig. 7) on Cylinder Neck (13) and rotate Front Extension 180°, bottom half of the adapter can be then re-tighten Cylinder Neck Bolts.
Page 5
8.5H x 5.5”W SETUP AND OPERATION SETUP AND OPERATION PULLING OUT OF THE GROUND OR PANEL cont. PULLING OUT OF THE GROUND OR PANEL cont. 4. Pull Mid–Frame Hitch Pin and telescope mid-frame to desired 8. Adjust front roller pivot (6) length and reinstall pin.
Page 6
8.5H x 5.5”W SETUP AND OPERATION SETUP AND OPERATION PULLING OUT OF THE GROUND OR PANEL cont. PULLING OUT OF THE GROUND OR PANEL cont. 12. Make sure all hitch pins are secure 16. Plug puller power cord into pigtail (Fig.
Page 7
8.5H x 5.5”W SETUP AND OPERATION SETUP AND OPERATION OVERHEAD PULL OVERHEAD PULL cont. 1. Always wear gloves and eye protection 4. Pull Mid-Frame Hitch Pin and pull Mid-Frame (14) out until it is when working with pullers. in its fully extended position. Mid-Frame MUST be in the full extended position for overhead pulls.
Page 8
8.5H x 5.5”W SETUP AND OPERATION SETUP AND OPERATION OVERHEAD PULL cont. OVERHEAD PULL cont. 7. Adjust front roller pivot (6) by 11. Make sure all hitch pins are removing pin and positioning to secure with a locking cotter proper angle saving pin to install pin.
8.5H x 5.5”W SETUP AND OPERATION ADDITIONAL HELP OVERHEAD PULL cont. TROUBLE SHOOTING 1. To add extra length to the Front End Extension, loosen 15/16” bolts 15. Plug puller power cord into from the Cylinder Neck (13) and remove the Cylinder Neck and set pigtail adaptor than plug pigtail aside.
This warranty also does not cover Southwire Contractor Equipment 3. Southwire will cover standard freight charges (Ground Courier Rate) incurred in connection products that have been modified by any party other than Southwire Company, LLC or its with products that Southwire ultimately determines to be defective.
Need help?
Do you have a question about the Maxis XD10 and is the answer not in the manual?
Questions and answers