Download Print this page

About This Guide; Packing List; Safety Guidelines; Installing The Switch - Huawei S1700-8-AC Installation, Quick Start

Unmanaged switches
Hide thumbs Also See for S1700-8-AC:

Advertisement

1 关于本手册

1 About This Guide

Thank you for purchasing a Huawei S1700 series switches. This guide describes the positioning, features, installation,
and cable connections of S1700 series switches. Figures in the document are for reference only and may be different
from actual devices.

2 Packing List

Chassis: S1700-8-AC or S1700-8G-AC
Quick Start Guide

3 Safety Guidelines

Take ESD protection measures before the installation, for example, wear ESD gloves or ESD wrist strap.
Do not place other objects on the chassis.

4 Installing the Switch

Scenario 1: Installing the Device on a Worktable
Scenario 2: Installing the Device on a Wall
Before You Start
Before drilling holes in a wall, make sure there are no power cables in the wall to avoid electric shock.
The panel with ports must face down to protect the ports from water.
Ensure that there are no flammable or explosive materials near the switch and no obstructions within 100 mm
around the switch.
The M4 screws and plugs need to be purchased separately.
Installation Procedure
Step 1
Measure the distance between two mounting holes on the rear panel of the switch, and mark the
positions to drill holes on the wall according to this distance.
Step 2
Use a hammer drill with φ6 drill bit to drill holes on the wall, and fix the plugs on the wall.
Step 3
Secure the M4 screws to the plugs.
Step 4
Install the switch on the wall.
Power Adapter
1

Advertisement

loading

This manual is also suitable for:

S1700-8g-ac