Download Print this page
Panduit PZICEA Installation Instructions Manual
Panduit PZICEA Installation Instructions Manual

Panduit PZICEA Installation Instructions Manual

Panzone in-ceiling enclosure, active equipment version

Advertisement

Quick Links

© Panduit Corp. 2008
List of Components:
(1) Set of two Keys
(1) Left Mounting Bracket
(1) Right Mounting Bracket
(1) Fan Module
(6) Grommets
(2) Tak-Ty Rolls (Hook and Loop)
(4) Self-Tapping #10-32 screws
(1) Ceiling Tile Template
(1) Electrical Junction Box
(1) Integrated Horizontal Slack Manager
(1) Adjustable Air Dam
(2) Filters
(4) Entry/Exit Knockout Plates
Air Inlet
Keyed Locks

Table of Contents

Install in Ceiling..........................................................................................................................................
Electrical Installation.................................................................................................................................
Equipment Installation...............................................................................................................................
Cable Routing and Slack...........................................................................................................................
Patch Cord Management...........................................................................................................................
Maintenance...............................................................................................................................................
Accessories................................................................................................................................................
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
P
PZICEA Active Equipment Version
Part Numbers:PZICEA
INSTALLATION INSTRUCTIONS CM361C
Set of two keys
#10-32 screws
Fan Module
Entry/Exit Knockout Plates (4x)
Page 1 of 8
Z
In-Ceiling Enclosure
AN
ONE
Grommets
Adjustable Air
Dam
Electrical Junction Box
Tak -Ty Rolls
Ceiling tile template
Mounting Brackets
Integrated
Horizontal
Slack Manager
Note: Enclosure door load rating
is 50 lbs.
2
3
4
5
6
8
8

Advertisement

loading

Summary of Contents for Panduit PZICEA

  • Page 1: Table Of Contents

    In-Ceiling Enclosure PZICEA Active Equipment Version Part Numbers:PZICEA INSTALLATION INSTRUCTIONS CM361C © Panduit Corp. 2008 List of Components: (1) Set of two Keys (1) Left Mounting Bracket (1) Right Mounting Bracket (1) Fan Module (6) Grommets Tak -Ty Rolls (2) Tak-Ty Rolls (Hook and Loop)
  • Page 2: Install In Ceiling

    Trace the outline with a utility knife to extract the necessary shape to insert into the enclosure. Ceiling Tile Ceiling Tile Bracket Template Ceiling Tile Ceiling Tile Cutout Thumb Tacks For Technical Support: www.panduit.com/resources/install_maintain.asp Page 2 of 8...
  • Page 3: Electrical Installation

    Mounting Holes (Receptacles not included) NOTE: Install power per local building codes and regulations. Cross-sectional view from inside enclosure #10-32 Thread Cutting Screws Above the junction box is shown with already installed receptacles. For Technical Support: www.panduit.com/resources/install_maintain.asp Page 3 of 8...
  • Page 4: Equipment Installation

    Note: Maintain a minimum gap of approximately 1/2” (12mm) between the door and the bottom of the switch for air flow. 3 RU for Patch Panels Mounting position for fiber termination box 3 RU for Patch Panels facing back facing forward Integrated Horizontal Slack Manager 2 RU for Network Switches For Technical Support: www.panduit.com/resources/install_maintain.asp Page 4 of 8...
  • Page 5: Cable Routing And Slack

    NOTE: Allow a minimum of 14” of cable slack to allow the door to open and close properly. Enclosure door closed Enclosure door open Tie down bar used Tie down bar used to secure cables to secure cables Secure cable at Secure cable at this location this location For Technical Support: www.panduit.com/resources/install_maintain.asp Page 5 of 8...
  • Page 6: Patch Cord Management

    Repeat the process for each bay of ports on the switch. Use Tak Ties to secure cables to sheer forms located on the horizontal slack manager. First bay of ports (12) on the switch For Technical Support: www.panduit.com/resources/install_maintain.asp Page 6 of 8...
  • Page 7 Repeat the process for each bay of ports on the switch. Use Tak Ties to secure cables to sheer forms located on the horizontal slack manager. Fourth bay of ports (12) on the switch For Technical Support: www.panduit.com/resources/install_maintain.asp Page 7 of 8...
  • Page 8: Maintenance

    Filter pad Bracket Accessories Filter replacement kit Grounding and Bonding Kit PZICGK PZICFRK Grounding cables PZICGK HARDWARE 5 pairs of replacement filter pads For instuctions in Local Languages E-mail: and Technical Support: cs@panduit.com Fax: www.panduit.com/resources/install_maintain.asp (708)444-6448 www.panduit.com Page 8 of 8...