Flue Installation For 705 Model; Horizontal Terminations - State Water Heaters Tankless On-Demand 705 Series 200 Operation And Installation Manual

Direct vent tankless water heater
Table of Contents

Advertisement

Flue Installation for the 705 Model
Air Intake Assembly
The air intake system consists of a field supplied 4
inch diameter stainless steel, Schedule 40 PVC, ABS
or CPVC pipe. A maximum 6 feet of semi-rigid
flexible aluminum ducting can also be used. Foil
wrapped dryer vent and cell core products are not
authorized.
The air intake has a zero clearance to combustibles.
Air Intake Connection
1.Drill 2 small holes at the end of the air intake pipe.
2.Slide the pipe over the air intake terminal.
3.Using a level, ensure the pipe is straight up and
down.
4.With self tapping screws, attach the pipe to the air
intake terminal.
5.Apply a bead of silicone around the pipe and air
intake terminal, ensuring an air tight connection.
Exhaust Pipe Assembly
Refer to the manufacturer's installation instructions for
the specific exhaust vent system.

Horizontal Terminations

The air intake must be located in relation to the exhaust as shown below. The air intake must angle 1/4 inch per
foot to the termination to prevent entry of rain.
6
"
Vent
8
"
Intake
The vent termination and air
intake must be in the same
pressure zone and face the
same direction.
28
12"
Optional
Intake
EXHAUST
COMBUSTION AIR /
INTAKE
12" MIN. ABOVE
GRADE OR
SNOW LEVEL
305, 505, 705 Indoor Manual
1
3
Venting Clearances to Combustibles
Vent Size
4" (102 mm)
4"
SLOPE INTAKE AND EXHAUST
TOWARD OUTSIDE TERMINATION
2
4
Enclosed
Horizontal &
Vertical
4" (102 mm)
MINIMUM 1/4" PER FOOT
Unenclosed
Horizontal &
Vertical
1" (26 mm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

U287-084305505705

Table of Contents