Fit Combustion Chamber Cover; Fit Boiler Casing - Vaillant turboMAX pro 24/2 E Instructions For Installation And Servicing

Wall hung room sealed fan assisted combination and system boilers
Hide thumbs Also See for turboMAX pro 24/2 E:
Table of Contents

Advertisement

7 Gas supply adjustments (Commissioning Part II)

7.5 Fit combustion chamber cover

Carefully re-fit the combustion chamber cover to the
boiler ensuring it is correctly sealed. Secure cover with
retaining clamps.

7.6 Fit boiler casing

• Carefully push case (1) onto the boiler such that the
locating points either side at the top of the boiler
engage. Push the casing onto the securing clips at the
bottom of the boiler.
• Close control panel (2).
• Secure control panel by turning both securing fasten-
ers (3) clockwise by 90°.
I
0
2
Fig. 7.4: Fit boiler casing
24
1
90°
90°
I
0
3
Instructions for Installation and Servicing turboMAX pro R3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turbomax pro 28/2 e

Table of Contents