Summary of Contents for Thermon Terminator ZE-B Beacon
Page 1
Terminator ZE-B Beacon LED End of Circuit Light Kit INSTALLATION PROCEDURES...
Page 2
Light Module Cover 3. Identify parts against the packing list to ensure the proper type and quantity has been received. Banding Guide 4. Store in a dry location. Banding LED Light Module Installation Precautions • To minimize the potential for arcing and fire caused by product damage Order Separately or improper installation use ground-fault protection. SCTK Connection Termination Kits (per cable) • Installation must comply with Thermon requirements and be installed in accordance with the applicable national and local codes. SCTK-1 for BSX, RSX, VSX-HT • Component approvals and performance ratings are based on the use SCTK-2 for KSX, HTSX of Thermon specified parts only. • De-energize all power sources before opening enclosure. SCTK-3 for FP, HPT • Keep ends of heating cable and kit components dry before and during installation.
INSTALLATION PROCEDURES 300 mm (12") 50 mm Weep Hole (2") Max. Connection Locate bus connection (HPT and FP only) and Insert cable into expediter. If mounted Slide expediter toward pipe and route cable cable as shown. Cut end of cable at angle to aid on bottom of pipe, punch out weep hole. through support base entry. in piercing grommet. Leave additional cable for Note: For HPT and FP cable, exchange grommet expansion loop. in Terminator with GRW-G provided in PETK-3. 101 mm (4") Min.
Need help?
Do you have a question about the Terminator ZE-B Beacon and is the answer not in the manual?
Questions and answers