Summary of Contents for Thermon Terminator DE-B Beacon
Page 1
Terminator DE-B Beacon LED End of Circuit Light Kit INSTALLATION PROCEDURES...
Page 2
The National Electrical Code (NEC) and Canadian Electrical SCTK-2D for KSX, HTSX Code (CEC) require ground-fault protection of equipment for SCTK-3D for FP, HPT each branch circuit supplying electric heat tracing. • Installation must comply with Thermon requirements and be installed in accordance with the NEC, CEC, or any other applicable national and local codes. Item Quantity Description • Component approvals and performance ratings are based on Connection Boots the use of Thermon specified parts only. User supplied power...
INSTALLATION PROCEDURES 300 mm (12") 50 mm Weep (2") Hole Max. Min. Connection 300 mm (12") Locate bus connection (HPT and FP only) and Insert cable into expediter. If mounted on Slide expediter toward pipe and route cable cable as shown. Cut end of cable at angle to aid bottom of pipe, punch out weep hole. through support base entry. in piercing grommet. Leave additional cable for Note: For HPT and FP cable, exchange grommet expansion loop. in terminator with GR-G provided in PETK-3. 101 mm (4") Min. Do Not Band Over Cable Insert banding guide into expediter and snap Mount expediter to pipe using pipe band. Do...
Need help?
Do you have a question about the Terminator DE-B Beacon and is the answer not in the manual?
Questions and answers