Download Print this page

CertaUPS C300R Installation Manual

External battery pack, 1000-3000va
Hide thumbs Also See for C300R:

Advertisement

Quick Links

External Battery Pack
Service and support
WWW.CERTAUPS.COM
INFO@CERTAUPS.COM
T: +44 (0)1246 431 431
C300R
1000-3000VA
Installation/Manual

Advertisement

loading

Summary of Contents for CertaUPS C300R

  • Page 1 External Battery Pack C300R 1000-3000VA Installation/Manual Service and support WWW.CERTAUPS.COM INFO@CERTAUPS.COM T: +44 (0)1246 431 431...
  • Page 3 1. Introduction This manual has been written for the intention of aiding the owner of a Certa C300R in connecting External Battery Modules (EBMs) to their UPS. This guide provides easy to follow, step by step instructions so that the user can connect battery modules to their UPS at any date with ease, after receiving the system.
  • Page 4 If connecting EBMs into a Rackmount system check that you have the required available space before commencing the work. The EBMs require 2U Rack space for each unit that is being connected to your UPS. The instructions will follow from the next page. Both images and typed instructions are given to ease the process for the UPS owner.
  • Page 5 2. Connecting a single EBM 2.1 Connecting the EBM in Tower Configuration: In order to configure one or more EBMs with the UPS in tower configuration the UPS owner will need the extended UPS stands that were sent with the UPS. Please Note: Remember to disconnect the protected equipment and power down the UPS before installing any EBMs this will prevent damage to the equipment and reduce...
  • Page 6 2. Next, tighten the screw on the UPS cover for stabilisation and to make the configuration secure. 3. Connect an Earth line from the UPS (port A) to the EBM (port B).
  • Page 7 4. Take off the front panel. To do this remove the 2 top screws from the front of the UPS and carefully take out the LCD screen and remove the screw that’s behind it. Finally push inward the small gate on the side of the front panel in order to remove it.
  • Page 8 5. Once the EBM has been successfully connected to the UPS and the front panel has been reassembled correctly the UPS needs to be configured to recognise the EBM has been installed. To do this, refer to the instructions on page 16. 6.
  • Page 9 1. Using the same method as assembling the UPS in rack form, assemble the EBM into the rack-mounting above or below the UPS. It’s recommended that the EBM is installed according with where the most available room is present as this will allow for future expansions to the number of EBMs connected to your UPS.
  • Page 10 Connect an earth line from the UPS (port A) to the EBM (port B) 3. Take off the LCD box, and unscrew the internal screws.
  • Page 11 4. Take off the front panel. To do this remove the 2 top screws from the front of the UPS and carefully take out the LCD screen and remove the screw. Finally push inward the small gate on the side of the front panel in order to remove it.
  • Page 12 C13/C19 ports. 3. Connecting Multiple EBMs The C300R UPS includes an external battery port that allows users to connect multiple EBM’s in order to provide additional backup time. In order to do this please follow the...
  • Page 13 3.1 Connecting multiple EBMs in Tower Configuration Please Note: Remember to disconnect the protected equipment and power down the UPS before installing any EBMs. This will prevent damage to the equipment and reduce the chance of electrical shock. 1. Connect an Earth line between the UPS and the first EBM, and then connect a second Earth Line between the first EBM and the second EBM.
  • Page 14 2. Take off the front panel. To do this remove the 2 top screws from the front of the UPS and carefully take out the LCD screen and remove the screw. Finally push inward the small gate on the side of the front panel in order to remove it.
  • Page 15 3. Once all of the EBMs have been successfully connected to the UPS and the front panel has been reassembled correctly, the UPS needs to be configured to recognise the number of EBMs that have been installed. To do this, refer to the instructions on page 16.
  • Page 16 1. Connect an Earth line between the UPS and the first EBM, and then connect an Earth Line between the first EBM and the second EBM. 2. Take off the front panel. To do this remove the 2 top screws from the front of the UPS and carefully take out the LCD screen and remove the screw.
  • Page 17 3. Once all of the EBMs have been successfully connected to the UPS and the front panel has been reassembled correctly the UPS needs to be configured to recognise the number of EBMs that have been installed.
  • Page 18 4. After installing and configuring the UPS to recognise the EBMs, the protected equipment can then be reconnected to the UPS. Please make sure the load equipment is turned off before connecting all loads into the output C13/C19 ports. Note: One or more EBMs can be connected to the UPS in the same way as shown above (Up to a maximum of 2 EBMs).
  • Page 19 4. Select setting value: Press the Select button to select the number of EBMs according to your UPS configuration. (up to a maximum of 9) 5. Confirm settings: Press and hold the Enter button one second, and the UPS will then return to settings mode. 6.