Personnel lock system Quick-Dush ECO-LINE
Preparation:
Previous to the assembly of the personnel lock:
 Determine the exact position and the ground plan
 The ground has to be flat and clean
Assembly:
Put the bottom elements straight ahead from each other and place the grates.
In case of unevenness of the space, at least 2 squared timbers of a minimal cross
section of 10 cm x 10 cm should be placed underneath the total length and aligned.
Note:
The sewage water connection of the shower cabin should have the shortest way to the
water treatment device, in order to avoid needless lengths of hoses or cables. The
mounting brackets of the base tube have to be cleaned before the insert of the door and
wall elements!
load capacity of single floor element: max. 150 kg
Insert the corner profile in the connection corner of two bottoms and tense the quick
clamping fixture situated at the end of the corner profile with the bottom.
Instruction manual

7 Initial operation

Seite 8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quick-dush eco-line 900Quick-dush eco-line 750

Table of Contents