Examination Before Installation - T-Verter E2 Series Operating Manual

High performance adjustable speed micro drives
Table of Contents

Advertisement

2. Examination before installation

Every inverter has been fully tested and examined before shipment. Please carry out the following
examination procedures after unpacking your AC inverter.
Check to see if the model number of the AC inverter matches the model number of the AC
inverter that you ordered.
Check to see whether any damage occurred to the AC inverter during shipment. Do not
connect the AC inverter to the power supply if there is any sign of damage.
Report this to a regional sale representative if you find any abnormal condition as mentioned
above.
2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E2 Series and is the answer not in the manual?

Table of Contents

Save PDF