Plumbing Manifold - Bosch Worcester GREENSTAR CDi Series Instruction Manual

Wall hung rsf gas-fired condensing combination boiler for sealed central heating systems and mains fed domestic hot water
Table of Contents

Advertisement

CH Flow
(alternative
from above
appliance)
22 mm
CH flow
22 mm
c;J!:_
DHW Out (alternative from above appliance) 15 mm
l
U
Gas Supply (alternative from above appliance) 22 mm
: ~
c . . ~
~ -
1
I
I
I
I
I
I
H
c:;J!:_
Mains Water In (alternative from above appliance) 15 mm
CH Return (alternative from above appliance) 22 mm
DHW Out 15 mm
Mains Gas Supply 22 mm
CH return 22 mm
Mains Water In 15 mm
~ O R C E S T E R
Bosch Group
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 25CDV30CDV37CDci42CDI
6 720 613 700a (2006/11)
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22 mm compression fittings
DHW:
15 mm compression fittings
Gas:
22 mm compression fittings
Use the fittings supplied in the Hardware
pack.
PREPLUMBING
With the plumbing manifold installed,
pipework can be installed to the valves on the
manifold.
The system can be filled (without the boiler
being connected) using the charging link
assembly (see page 23).
The valves can be closed enabling the DHW
and CH systems to be tested. The boiler can
be installed at later date.
RUNNING PIPES BEHIND THE BOILER
If the boiler pipes are to be run behind the
appliance ensure that the pipes pass close to
the wall as shown in the diagram opposite,
and within the pipe guide.
PLUMBING MANIFOLD

Advertisement

Table of Contents
loading

Table of Contents