Download Print this page

Primex Verge PR1500 Installation Instructions page 3

Allfield media distribution enclosure

Advertisement

PRIMEX
MDE Installation Instructions
BROWNFIELD Wall-mount Installation
STEP 1
Wall mount install
Using a stud finder, mark position at a recommended height of
36" - 48".
Pre-drill holes in the center slots of the enclosure prior to mounting.
STEP 3
Affix PR1500 to stud
Affix PR1500 on a single stud using two No. 8 wood screws in the
pre-drilled holes. Be sure to level before securing the bottom screw.
1
FOR MORE INFORMATION CONTACT:
1.604.881.7875
1.604.881.7835
T
F
www.primex.com
452-3120 E & OE 12/18
2
3
Allfield Media Distribution Enclosure
STEP 2
Remove knockout and insert optional keystones.
Trim support ribs on knockout using flush cutter tool. (P/N: 125-
1683) Snap in keystone adapter (P/N: 125-1152 sold separately)
and install optional keystones (available from Primex).
Remove knockouts for power as needed.
1
3
STEP 4
Affix Smart Lid
Place smart lid into place. Optional key lock kit (P/N: 125-1570)
and hex lock kit (P/N: 125-1641) available.
Verge PR1500
2
4
Fit everything. Together.

Advertisement

loading