Download Print this page

Primex Verge PR1500 Installation Instructions

Allfield media distribution enclosure

Advertisement

Quick Links

PRIMEX
MDE Installation Instructions
The Primex PR1500 Allfield MDE is an all-in-one new
build and retrofit WiFi transparent enclosure. It mounts
in-wall, on-wall or free standing for single or multi-family
applications. The unique, patented Smart Lid is self-aligning
and closing with an adjustable depth and clean aesthetics.
The PR1500 provides ample room for multi-play applications
from broadband to smart home installations.
GREENFIELD Installation
STEP 1
Install horizontal joist and electrical box
To ensure a comfortable working height it is recommended that
the top of the electrical box be installed 36" - 48" from the ground.
Ensure that the support joist is level.
Note: Install if required by your local electrical code.
STEP 3
Install base
Install single #8 flat head screw in corner flange, level, then secure
with additional screws.
FOR MORE INFORMATION CONTACT:
1.604.881.7875
1.604.881.7835
T
F
www.primex.com
452-3120 E & OE 12/18
Allfield Media Distribution Enclosure
WARNING
• DO NOT stretch enclosure walls or lid won't seat properly.
• DO NOT over tighten mounting screws.
• DO NOT use mounting screws larger than #8.
• RECOMMENDED mounting height, 36" - 48" from the floor.
• LEAVE paintshield in during installation to protect enclosure
during drywall installation and painting.
* On-wall maximum load rating: 10kg (22lbs)
STEP 2
Remove bottom knock outs
Prior to installation, remove required knockout covers. Then,
remove the knockout(s) for the electrical box using a Primex
(P/N: 125-1683) flush cutter tool to trim support ribs. Trim excess
plastic with knife.
Supports drop-in and under-mount gangbox installations.
STEP 4
Install Electrical Kit
Place gangbox into cut out knockout, connect power and secure
receptacle to gangbox using screws.
Note: Secure gangbox to horizontal joist if required by your local
electrical code.
Verge PR1500
Fit everything. Together.

Advertisement

loading

Summary of Contents for Primex Verge PR1500

  • Page 1 Prior to installation, remove required knockout covers. Then, the top of the electrical box be installed 36” - 48” from the ground. remove the knockout(s) for the electrical box using a Primex Ensure that the support joist is level. (P/N: 125-1683) flush cutter tool to trim support ribs. Trim excess plastic with knife.
  • Page 2 Remove the conduit knockouts using a flush cutter tool and blunt force Fit drywall over top of the installed enclosure base and secure. tool. Connect conduit for outgoing and incoming services and secure with Primex conduit reducers (3/4”-1/2” reducers P/N: 125-1022, 1” - 3/4” reducers P/N: 125-0936). STEP 7...
  • Page 3 Trim support ribs on knockout using flush cutter tool. (P/N: 125- 36” - 48”. 1683) Snap in keystone adapter (P/N: 125-1152 sold separately) and install optional keystones (available from Primex). Pre-drill holes in the center slots of the enclosure prior to mounting. Remove knockouts for power as needed.
  • Page 4 STEP 3 STEP 4 Finish Installation Attach feet Connect services and mount additional components using Primex’s Install accessory feet (P/N: 125-1571 sold separately) using the mounting systems. Optional key locks available (P/N: 125-1570). screws provided. ACCESSORIES Product...