PRIMEX
MDE Installation Instructions
The Primex PR1500 Allfield MDE is an all-in-one new
build and retrofit WiFi transparent enclosure. It mounts
in-wall, on-wall or free standing for single or multi-family
applications. The unique, patented Smart Lid is self-aligning
and closing with an adjustable depth and clean aesthetics.
The PR1500 provides ample room for multi-play applications
from broadband to smart home installations.
GREENFIELD Installation
STEP 1
Install horizontal joist and electrical box
To ensure a comfortable working height it is recommended that
the top of the electrical box be installed 36" - 48" from the ground.
Ensure that the support joist is level.
Note: Install if required by your local electrical code.
STEP 3
Install base
Install single #8 flat head screw in corner flange, level, then secure
with additional screws.
FOR MORE INFORMATION CONTACT:
1.604.881.7875
1.604.881.7835
T
F
www.primex.com
452-3120 E & OE 12/18
Allfield Media Distribution Enclosure
WARNING
• DO NOT stretch enclosure walls or lid won't seat properly.
• DO NOT over tighten mounting screws.
• DO NOT use mounting screws larger than #8.
• RECOMMENDED mounting height, 36" - 48" from the floor.
• LEAVE paintshield in during installation to protect enclosure
during drywall installation and painting.
* On-wall maximum load rating: 10kg (22lbs)
STEP 2
Remove bottom knock outs
Prior to installation, remove required knockout covers. Then,
remove the knockout(s) for the electrical box using a Primex
(P/N: 125-1683) flush cutter tool to trim support ribs. Trim excess
plastic with knife.
Supports drop-in and under-mount gangbox installations.
STEP 4
Install Electrical Kit
Place gangbox into cut out knockout, connect power and secure
receptacle to gangbox using screws.
Note: Secure gangbox to horizontal joist if required by your local
electrical code.
Verge PR1500
Fit everything. Together.