Scion Instruments
INSTRUMENT SPECIFICATIONS
Every instrument is fully tested; the results of the tests, as well as the
methods used during these tests, are presented as part of this manual (refer
to section 1).
START UP
At initial START-UP as well as after a longer idle period,
follow the instructions below:
Connect all the gases to the instrument.
•
Switch the power on.
•
Load the appropriate method.
•
Check the flow settings.
•
Condition the system as described in this manual.
•
Do not make any changes to the methods.
•
The system is ready for injections.
•
For a new system there is no need to do any flow measurement or
flow tuning before power-up.
The instrument is tuned and tested in the Factory in Goes.
Scion Instruments
Transformer Gas Analyzer Reference Manual
Page: 4