TABLE OF CONTENTS INTRODUCTION INTRODUCTION With solar modules from Hanwha Q CELLS (hereafter referred Beware of possible danger or damage. Cate- to as "Q CELLS") you can directly transform the sun’s limitless gories: PLANNING energy into environmentally-friendly solar electricity. In order •...
Width 1030 mm 1030 mm necessary safety regulations during set-up and installation. Q CELLS assumes no liability on the basis of these instructions. Frame height 32 mm 32 mm Q CELLS is only liable in the context of contractual agreements Area 1.79 m²...
Fig. 2: Forces acting on the module are relayed to the mounting Installation options for crystalline Q CELLS modules. All dimensions are given in mm. Also observe the maximum Please note the following guidelines that apply to the installation substructure.
The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting system including clamps has to be evaluated by the system supplier. The Q CELLS listed test load values were determinded with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm.
The packaging is not weatherproof. Ä Do not install modules in close proximity to air conditioning systems. INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS...
Ensure that modules and tools are not subject (e.g. do not drill any additional holes). to moisture or rain at any time during instal- lation. INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS...
Only use dry, insulated tools for electrical work. Ä Insulate any exposed cable ends. Only connect cables with plugs. Ä INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS...
FAULTS AND DEFECTS MAINTENANCE AND CLEANING Protective Grounding DANGER! Q CELLS solar modules are known for a long operating life and Note! Module damage may occur! Ä The modules must be grounded in accordance with the local Risk of fatal injury due to electric shock! minimal maintenance effort and expense.
Need help?
Do you have a question about the Q.PEAK DUO-G6 Series and is the answer not in the manual?
Questions and answers