Move and store units in an upright position. Do not stack units. Inspect shipment for shipping
damage and check packing slips for accuracy. Any equipment or cartons in question should be
removed from the packing and physically inspected. If any damage is detected, the carrier
should make a note on the delivery slip acknowledging the damage. In some cases smaller
items like thermostat or temperature sensors will be packed and shipped inside the unit.
During freezing conditions special consideration should be made to prevent unit
damage. If a unit is taken to the job site or put in storage, antifreeze will need to be
pumped into the water coils to prevent freezing.
F ailure to do this will void the warranty.
3.0 Electrical Hazard Warnings
Page 9
Need help?
Do you have a question about the GCHP Series and is the answer not in the manual?