Reliable DDX-LP PrePak Instructions For Installation, Operation Care And Maintenance page 10

Table of Contents

Advertisement

Ordering Information: PrePak Part Number Configuration
DDX-LP PrePak Valve
Size/System
Trim Type
Side Control Valve
3
U
2 = 2"
0 = 2-1/2"
3 = 3"
3 = PrePak
4 = 4"
6 = 6"
8 = 8"
A = 2" w/ System Side
Control Valve
B = 2-1/2" w/ System Side
Control Valve
C = 3" w/ System Side
Control Valve
D = 4" w/ System Side
Control Valve
E = 6" w/ System Side
Control Valve
F =8" w/ System Side
Control Valve
Note:
(1)
No Solenoid Valve or Control Panel are utilized with this trim. If selected, the 6th and 7th digits in the P/N are required to be "0" (None).
Not Used
(2)
Air Compressor sizing may differ if specified sprinkler system has an uncommon volume capacity.
(3)
655 U 3 0 0 Y Z 0
Releasing/Control
Solenoid Valve
0
0 = None
0 = None
(1)
Air Compressor
Panel
Y
0
0 = None
1 = 1/2 HP 115 VAC
(systems up to 3" in size)
2 = 1 HP 115 VAC
(for 4" systems)
3 = 1-1/2 HP 115 VAC
(for 6" & 8" systems)
System Air Devices
(3)
Z
0 = None
1 = Nitrogen Supply Kit
2 = Nitrogen Supply Kit &
Model B Accelerator
3 = NS-ASAM (Nitrogen
Supply w/ Auto Switchover
and Monitoring)
4 = NS-ASAM (Nitrogen
Supply w/ Auto Switchover
and Monitoring) & Model
B Accelerator
5= Model B Accelerator
6 = Desiccant Kit
7 = Desiccant Kit &
Model B Accelerator

Advertisement

Table of Contents
loading

Table of Contents