ENGLISH
9.
ADJUSTMENTS
!
Before carrying out any adjustments,
activate all the safety devices envisaged.
In particular, close the gas supply valve and
prevent access to all the devices which, if
activated, could lead to unexpected dangerous
situations putting personal safety and health at
risk.
EN
The first operation to carry out is to check the
supply pressure, proceeding as follows:
1. Close the gas supply valve.
2. Remove the knob (A).
3. Unscrew the screws (B) and remove the
instrument panel (C).
4. Unscrew the closing screw (D) of the pressure
socket of the supply pipe
6. Connect a pressure gauge to the socket (e.g.
a manometer)
7. Open the gas interception valve and measure
the value of the supply pressure. CAUTION: If
the value of the supply pressure measured
lies outside the interval shown in "table
pressure gas" ,it is not possible to go ahead
with installation and it is necessary to inform
the gas board of the anomaly with the mains.
8. Close the gas interception valve, disconnect
the pressure gauge, screw the closing screw
back on and close the front door.
B
D
Manifold
Pressure
NATURAL
(D)
GAS
i.w.c.
AX-CPG-1
4"
AX-CPG-2
4"
Tab. Pressure gas : Permissible limits for the gas
supply pressure.
12
ID 09
A
C
MIN Gas
MAX Gas
Supply
Supply
Pressure
Pressure
i.w.c.
i.w.c.
5"
10.5"
5"
10.5"