Download Print this page

Operation - Schenker Modular 100 230V Electron digital Operation And Maintenance Manual

Advertisement

4. Maintenance
4.2 Verifications and periodic maintenance
The following periodic procedures are to be followed to maintain trouble free operation:

OPERATION

Strainer check and
cleaning
5 micron cartridge
replacement
Active carbon filter
replacement
Purge periodically
the air from the sys-
tem, opening at 45°
for a couple of min-
utes the depressuri-
zation valve
Check the pressure on the manometer located on
the front panel.
The working pressure depends on many factors
such as water temperature, salinity level of sea-
water, battery voltage, cleanliness of membranes
and type of installation.The pressure, under mid
range working conditions is in the range 7,5-8
bar. There is a small pressure peak, of about 0,5
Bars during commutations.
Membrane replacement
EVERY
Every 5 days
Every 15-20 days in
average conditions (4
hours/day usage).
Every 6 months
Close the grey valve
before open the filter
Every 15 days
20
PROCEDURE
Check and clean
Unscrew anticlockwise the filter
holder.

Advertisement

loading

Related Products for Schenker Modular 100 230V Electron digital

This manual is also suitable for:

100m220