Chapter3. Equipment Installation and Commissioning
3.1 Equipment installation
3.1.1
Unpacking steps
Before installing, disassemble the wooden box packaging the machine in the following steps:
Fig.3-1
Equipment Crate
Open the machine body crate with a crowbar (user supplied), and unpack the crate in sequence: top
cover, side cover, front and rear cover, and foot cup mounting plate (the crate of some parts is
connected with screws, which should be removed before unpacking).
Fig.3-2
Machine Body Crate
6