Infolock INSIGHT DLP SENSOR 0610S Hardware Installation Manual

Appliance

Advertisement

Quick Links

INSIGHT DLP SENSOR 0610S Appliance
Hardware Installation Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INSIGHT DLP SENSOR 0610S and is the answer not in the manual?

Questions and answers

Summary of Contents for Infolock INSIGHT DLP SENSOR 0610S

  • Page 1 INSIGHT DLP SENSOR 0610S Appliance Hardware Installation Guide...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS Section 1 Ratings ............... . Section 2 Site Preparation .
  • Page 3: Ratings

    1. RATINGS AC input voltage: 100 - 240 V (auto-range) Input frequency range: 50/60 Hz Rated input current: 100 - 140V 8.0 6.0A 200 - 240V 4.5 3.8V 2. SITE PREPARATION Setup location, rack and appliance precautions Elevated Operating Ambient Temperature - If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient temperature.
  • Page 4: Unpacking The 4-Post Rack Installation Assemblies

    UNPACKING THE 4-POST RACK INSTALLATION HARDWARE Verify that the ship kit includes the following installation hardware NOTE: Use the hardware supplied with your specific rack Installation Assembly A: Standard Rail Assemblies with Mounting Hardware if different from the hardware supplied in this kit. Two power cords* NOTE:...
  • Page 5: 4-Post Rack Installation With Standard Rails

    4A. 4-POST RACK INSTALLATION WITH STANDARD RAILS NOTE: The installation procedures for Sections 4A below and on page 9 are Step 1 for use with the rails and hardware provided in your ship kit. If different style rails are being used, or if your rack requires different hardware, refer to the instructions Locate the two adjustable standard rack rail assemblies.
  • Page 6: 4-Post Rack Installation With Quick Mount Rails (Square Hole Rack Only)

    4B. 4-POST RACK INSTALLATION WITH QUICK MOUNT RAILS (square hole rack only) Step 1 Locate the two adjustable standard rack rail assemblies. Insert the tabs on the front section of the adjustable Rack bracket tab rack rail assembly through the openings in the rear sections of the assemblies.
  • Page 7: Installing The Appliance In The 4-Post Rack

    INSTALLING THE APPLIANCE IN THE 4-POST RACK Align the inner fixed chassis rails on the appliance with the fixed chassis rack rail assemblies previously installed in the rack. Carefully slide the appliance into the rack rails until you hear the locking tabs on the chassis rails click into place. Push the appliance all the way into the rack until it stops.
  • Page 8: Unpacking The 2-Post Rack Installation Hardware

    UNPACKING THE 2-POST RACK INSTALLATION HARDWARE Verify that the ship kit includes the following installation hardware NOTE: Use the hardware supplied with your specific rack Installation Hardware if different from the hardware supplied in this kit. Two power cords* NOTE: Only two power cords A set of 2-post rack mounting hardware**...
  • Page 9: 2-Post Rack Installation

    NOTE: The following installation procedures for the 2-Post Rack are for use with the rails and hardware provided in your ship kit. If 2-POST RACK INSTALLATION different style rails are being used, or if your rack requires different hardware, refer to the instructions provided with your rail’s or rack’s Unpack the appliance and locate the mounting hardware ship kit.
  • Page 10: Installing The Appliance In The 2-Post Rack

    INSTALLING THE APPLIANCE IN THE 2-POST RACK Align the inner fixed chassis rails on the appliance with the fixed chassis rack rail assemblies previously installed in the rack. Carefully slide the appliance into the rack rails until you hear the locking tabs on the chassis rails click into place. Push the appliance all the way into the rack until it stops.
  • Page 11: Rear Panel Connections

    9. REAR PANEL CONNECTIONS NOTE: Do not cable the Ethernet ports at this time. Power Supply Module #1 Power Good LED #1 AC Power Inlet #1 Power Supply Lock #1 Power Supply #2 Power Good LED #2 AC Power Inlet #2 Power Supply Lock #2 COM Port USB Port 1 (generation 2)
  • Page 12: Section 10 Front Panel Operation

    9. REAR PANEL CONNECTIONS (continued) MGMT SPAN Step 1 Connect the Ethernet cables for MGMT, DLP, NOTE: The server offers redundant, hot-swap capability. The and SPAN (if required). connections to AC mains should be made in a manner appropriate Step 2 Connect any other required cables.
  • Page 13: Front Panel Operation

    10. FRONT PANEL OPERATION SENSOR INSIGHT DLP A ppliance NIC2 LED HDD LED NIC1 LED Power LED Power on the appliance Multi-function LED Remove the front bezel (if it is on the appliance) by pressing in on the left side of Blue LED Red LED System identification...
  • Page 14 2900 S QUINCY ST #330 ARLINGTON, VA 22206 +1 (877) 610-5625 Copyright © 2018 Infolock. All rights reserved.

Table of Contents