FPG INLINE GN Series Product Manual

Heated well
Hide thumbs Also See for INLINE GN Series:
Table of Contents

Advertisement

Quick Links

Inline GN Series
Heated Well

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INLINE GN Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FPG INLINE GN Series

  • Page 1 Inline GN Series Heated Well...
  • Page 2 Copyright © February 2016 Future Products Group Limited. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of Future Products Group Ltd.
  • Page 3: Table Of Contents

    Table of Contents INTRODUCTION ......................... 6 Welcome ................................6 Future Products Group (FPG) ........................6 Guidance and Help ............................. 6 Warranty ................................6 Warranty Period ............................6 Liability Exceptions ............................. 7 Specific Exclusions ............................. 7 Assessment ..............................7 Time Limit ..............................7 Caution ...............................
  • Page 4 TROUBLE SHOOTING ..................... 13 CLEANING ........................14 Cautions ................................. 14 Power ............................... 14 Water ................................ 14 Exterior ................................14 Metal Surfaces ............................14 Glass ................................ 14 Interior................................15 Cabinet Well ............................. 15 Stainless Steel Surfaces .......................... 15 Routines ................................. 15 Schedules ..............................
  • Page 5 Water Level Control ............................19 Indicator Module ............................19 Water Sensing Probes ..........................19 Auto-fill ..............................19 Mains Lead ..............................19 Lead Replacement ........................... 19 SPECIFICATIONS ......................20 Mechanical ..............................20 Electrical ................................. 20 Compliance ..............................21 Safety Aspects ............................21 Improvements ..............................
  • Page 6: Introduction

    INTRODUCTION Welcome DROP-IN HEATED WELL ASSEMBLIES INTRODUCTION Future Welcome to the world of FPG! Our products are designed and engineered to Products give you the optimal performance that you deserve with innovative visual Group (FPG) merchandising appeal. We are confident that you will be delighted with your state of the art inline food service cabinet, and that it will become a valued appliance.
  • Page 7: Liability Exceptions

    Any loss, or damage or expenses directly or indirectly arising from incorrect adjustment of the flow control valve, on auto-fill models. Assessment The liability under this warranty is dependent on an assessment by FPG, to determine the defect in workmanship or materials. Time Limit FPG does not guarantee that any service to be performed under this warranty will be carried out within any particular time limit.
  • Page 8: Operation

    OPERATION Configuration DROP-IN HEATED WELL ASSEMBLIES OPERATION Mechanical The drop-in well consists of a main assembly, in which Features gastronorm dishes of various sizes can be mounted. A separate control panel is pre-connected to the well assembly, by a two metre cable. Operational This versatile heated well can be operated in various modes, and with various Modes...
  • Page 9: Controls

    Controls DROP-IN HEATED WELL ASSEMBLIES OPERATION Control Panel A control panel, mounted on the joinery, provides for all operational adjustments.  Temperature  Main On/Off Switch  Operating Mode Indicator lights are also provided to show when the water level is low and when the heating elements are on.
  • Page 10: Operating Mode

    Operating Mode DROP-IN HEATED WELL ASSEMBLIES OPERATION Choice of Mode It is important to select an appropriate operating mode, to suit the type of food, the type of dish and the required food temperature. The actual food temperature can be influenced by many variables, and it is important to regularly check actual food temperatures with a thermometer.
  • Page 11: Temperature Settings

    Temperature Settings DROP-IN HEATED WELL ASSEMBLIES OPERATION Setting Guide The following temperature settings for the operating modes are a guide only. Actual food temperatures should be regularly monitored, to ensure appropriate storage conditions. The required settings will depend on ambient conditions, whether overhead heat lamps are used and whether the dishes have lids etc.
  • Page 12: Preparation

    Preparation DROP-IN HEATED WELL ASSEMBLIES OPERATION Power Supply Ensure that power is connected to the cabinet. Decide on the If wet or steam operation is to be used, first add water to cover the elements. Required Mode The correct water level for the various modes is shown on the depth gauge, on the inside of the well.
  • Page 13: Trouble Shooting

    TROUBLE SHOOTING FAULT POSSIBLE CAUSE REMEDY The mains isolating switch is Turn isolating switch On. off, a circuit breaker or fuses Check external circuit breaker are off at the power board or fuses in the mains supply Eliminate leakage current External RCD has tripped and reset RCD Well does not operate/start...
  • Page 14: Cleaning

    CLEANING Cautions DROP-IN HEATED WELL ASSEMBLIES CLEANING Power ALWAYS TURN THE POWER SUPPLY OFF BEFORE CLEANING. Water The water in the well will remain hot for a long time after switching off the cabinet. Be careful when removing the food dishes or draining the water. Exterior DROP-IN HEATED WELL ASSEMBLIES CLEANING...
  • Page 15: Interior

    Interior DROP-IN HEATED WELL ASSEMBLIES CLEANING Cabinet Well To clean the cabinet well, first lift out the dishes and dividers and then drain the water out. A drain tap and overflow, is provided under the well. Clean the removable strainer from the drain. CAUTION The water will remain hot for a long time after switching off the cabinet.
  • Page 16: Installation

    INSTALLATION Regulations DROP-IN HEATED WELL ASSEMBLIES INSTALLATION Compliance It is very important that your drop-in heated well assembly is installed correctly with Local and that the operation is correct before use. Installation must comply with local Requirements electrical, health & safety and hygiene requirements. Setting Up DROP-IN HEATED WELL ASSEMBLIES INSTALLATION...
  • Page 17: Power Supply

    Setting Up cont. DROP-IN HEATED WELL ASSEMBLIES - INSTALLATION Power Supply Before connecting to the power supply, check that the local supply is correct to that shown on the rating plate, located on the side of the well. To assist with load balancing, the heating elements are star-connected, enabling the well to be connected to a three phase + neutral supply, or the phase terminals can be bridged, to use a single phase supply.
  • Page 18: Servicing

    SERVICING Control Gear DROP-IN HEATED WELL ASSEMBLIES SERVICING Location The incoming mains cable is terminated on a connecting block in an enclosure on the side of the well. A mains isolating switch is fitted next to the enclosure. This enclosure houses the contactor for the heating elements, the protective MCBs, the over temperature cut out, and terminals for connecting the elements.
  • Page 19: Temperature Probe

    Heating cont. DROP-IN HEATED WELL ASSEMBLIES - SERVICING Temperature The temperature probe for the controller is Probe located on the base of the well. Remove this panel from the underside of the well to access the probe. Over The over temperature cut out is mounted on the side of the well, within the Temperature power connection enclosure.
  • Page 20: Specifications

    SPECIFICATIONS Mechanical DROP-IN HEATED WELL ASSEMBLIES SPECIFICATIONS CABINET MODEL IN-GNH03 IN-GNH04 IN-GNH05 IN-GNH06 IN-GNH08 Height above joinery 18 mm Depth below joinery 260 mm plus drain tap assembly Width 805 mm Length 1320 mm 1660 mm 2000 mm 2340 mm 3020 mm Dry Weight 123 kg...
  • Page 21: Compliance

    Essential Safety Requirements  AS/NZS 4417 : Marking of Electrical Products Improvements DROP-IN HEATED WELL ASSEMBLIES SPECIFICATIONS Ongoing FPG reserves the right to change specifications and construction, as part of Development ongoing product improvement. IN-GNH03/4/5/6/8 - 21 - © Future Products Group...
  • Page 22: Electrical Circuit Diagrams

    ELECTRICAL CIRCUIT DIAGRAMS Model: IN-GNH03 Drop-in Heated Well, 3 Pan Bain Marie Model: IN-GNH03 Auto-fill Drop-in Heated Well, 3 Pan Bain Marie Part No.21966 Rev. M February 2016 - 22 - Heated Well GN Series...
  • Page 23: Model: In-Gnh04

    ELECTRICAL CIRCUIT DIAGRAMS, Continued Model: IN-GNH04 Drop-in Heated Well, 4 Pan Bain Marie Model: IN-GNH04 Auto-fill Drop-in Heated Well, 4 Pan Bain Marie IN-GNH03/4/5/6/8 - 23 - © Future Products Group...
  • Page 24: Model: In-Gnh05

    ELECTRICAL CIRCUIT DIAGRAMS, Continued Model: IN-GNH05 Drop-in Heated Well, 5 Pan Bain Marie Model: IN-GNH05 Auto-fill Drop-in Heated Well, 5 Pan Bain Marie Part No.21966 Rev. M February 2016 - 24 - Heated Well GN Series...
  • Page 25: Model: In-Gnh06

    ELECTRICAL CIRCUIT DIAGRAMS, Continued Model: IN-GNH06 Drop-in Heated Well, 6 Pan Bain Marie Model: IN-GNH06 Auto-fill Drop-in Heated Well, 6 Pan Bain Marie IN-GNH03/4/5/6/8 - 25 - © Future Products Group...
  • Page 26: Model: In-Gnh08 Auto-Fill

    ELECTRICAL CIRCUIT DIAGRAMS, Continued Model: IN-GNH08 Auto-fill Drop-in Heated Well, 8 Pan Bain Marie Part No.21966 Rev. M February 2016 - 26 - Heated Well GN Series...
  • Page 27: Spare Parts

    When ordering spare parts, it is important to quote the Serial Number printed on Serial Number the label fixed to the control panel. This serial number will enable FPG to trace details of the build specification of your particular assembly, and hence ensure that spare parts are fully compatible.
  • Page 28: Mechanical Drawings

    MECHANICAL DRAWINGS Dimensions DROP-IN HEATED WELL ASSEMBLIES MECHANICAL DRAWINGS IN-GNH03 to GNH06 Part No.21966 Rev. M February 2016 - 28 - Heated Well GN Series...
  • Page 29: In-Gnh08

    IN-GNH08 IN-GNH03/4/5/6/8 - 29 - © Future Products Group...
  • Page 30: Bench Cut-Outs

    Bench Cut-outs DROP-IN HEATED WELL ASSEMBLIES MECHANICAL DRAWINGS Over Mount Installation Part No.21966 Rev. M February 2016 - 30 - Heated Well GN Series...
  • Page 31: Flush Mount Installation

    Flush Mount Installation IN-GNH03/4/5/6/8 - 31 - © Future Products Group...
  • Page 32: Under Mount Installation

    Under Mount Installation Part No.21966 Rev. M February 2016 - 32 - Heated Well GN Series...
  • Page 33: Auto-Fill Components

    Auto-fill Components DROP-IN HEATED WELL ASSEMBLIES MECHANICAL DRAWINGS IN-GNH03/4/5/6/8 - 33 - © Future Products Group...
  • Page 34 Part No.21966 Rev. M February 2016 - 34 - Heated Well GN Series...
  • Page 35 IN-GNH03/4/5/6/8 - 35 - © Future Products Group...
  • Page 36 Part No.21966 Rev. M February 2016...

This manual is also suitable for:

In-gnh03In-gnh04In-gnh05In-gnh06In-gnh08

Table of Contents