Weekly Inspection - Honeywell Titan SCBA Training Manual

County of los angeles fire department
Hide thumbs Also See for Titan SCBA:
Table of Contents

Advertisement

f.
GAUGE: Inspect the gauge lens for cracks, the gauge pressure indicator should point to
the red empty area with the air cylinder valve off.
g.
FACEPIECE: Inspect the lens for scratches and abrasions that significantly impair visi-
bility. Any evidence of heat deformity to the lens is cause for immediate removal form
service and inspection by the SCBA Repair Shops. Check the facepiece body, sealing
skirt, and five point head net for nicks, tears, pliability, and damage from age, heat, or
contamination. The five point head net should be stored fully extended to allow rapid
donning. Inspect the air inlet port for damage and dirt.
h.
VOICE AMPLIFICATION SYSTEM: Inspect the Voice Amplification System (VAS)
for cracks or damage. Ensure that the unit is securely attached to the facepiece. Turn on
the VAS and visually check the red LED light for operation, a flashing amber light indi
cates low battery power, replace the three AAA batteries. Place the facepiece to your
face and speak to check amplification function. The Voice Amplification System shall
be turned off for storage.
i.
PASS DEVICE: Inspect the PASS Device for cracks or damage. Ensure that the un i t
is securely attached to the dual quick connect fitting. Manually activate the PASS,
note the ascending tone and green flashing LED lights. Allow the PASS to cycle to
full alert; the LED lights shoul d flash green and red as the alert tone increases in
volume. At full alert the LED lights should flash red. Tum off PASS device.
2.
WEEKLY TEST: The weekly tests shall comprise all of the requirements of the daily
inspection and include the following:
Facepiece Leak Test
1.
2.
3.
4.
SCBA Leak, Visual and Audible Alarm Test
1.
2.
Don and adjust the facepiece.
Block the Air KLIC opening with the palm of your hand.
Inhale gently and hold your breath for 3 seconds. The facepiece should collapse
slightly without leaking
Keeping the Air KLIC opening covered, exhale gently. The exhalation valve
should open freely without sticking or fluttering.
Insure the shut-off button and the bypass valve on the second state regulator is in
the off position.
Open the air cylinder valve to fully pressurize the hoses and regulators. The
PASS device should automatically activate, note the ascending tone and green
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents